My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18985
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:09 PM
Creation date
11/18/2007 9:28:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986148
IBM Index Class Name
Inspection
Doc Date
2/21/1995
Doc Name
WEASELSKIN PN M-86-148 ENCLOSED BOND RECALCULATION
From
DMG
To
WEASELSKIN CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HOURLY PRODUCTION cont'd Sheet 2 of 2 <br />----------------- <br />----------------- <br />Loader Cycle Tire cont'd <br />Rolling Resistance <br />Roadway underfooting conditions: <br />Haul :Rutted dirt, little/no ~aint.,l-2' fire pen. <br />Ret.urn:Rutted dirt, littleJno ~aint.,l-2' fire pen. <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Tire <br />Haul 6 return Tire: (ft) (Y) fZ) (Y) (sin.) <br />Haul Route: 200 0.00 5.00 5.00 0.217 (CHB }~x) <br />Return Route: 10 0.00 5.00 5.00 0.022 (CHB }~x) <br /> Total travel tine = 0.239 <br /> Tota] cycle tine = 0.7ti9 Minutes <br />Loader Bucket Capacity <br />...................... <br />Rated Capacity= 5.75 LCY (heaped) <br />Bucket fill factor= 1.100 Other - cork/dirt ~iztures (100-1205) <br />Adjusted capacity= 6.33 LCY <br />Job Condition Correction Factors <br />Site altitude = 6,b00 ft. <br />Altitude correction factor = 1.00 (CHB rdh) <br />Job efficiency factor = 0.83 (lsh/day) <br />Net Correction = 0.83 Multiplier <br />Unadjusted Hourly Unit Production 493.65 LCY/Hr <br />Adjusted Hourly Unit Production 409.73 LCYJHr <br />Adjusted Nourly Fleet Production 409.73 LCY/Hr <br />JUB COST <br />Fleet size = 1 Loader(s) Total job tine = ]O.BS Nours <br />Unit rost = 50.231 /LCY Total job cost = f1,02B.00 ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.