Laserfiche WebLink
<br />HOURLY PRODUCTION cont'd Sheet 2 of 2 <br />----------------- <br />----------------- <br />Loader Cycle Tire cont'd <br />Rolling Resistance <br />Roadway underfooting conditions: <br />Haul :Rutted dirt, little/no ~aint.,l-2' fire pen. <br />Ret.urn:Rutted dirt, littleJno ~aint.,l-2' fire pen. <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Tire <br />Haul 6 return Tire: (ft) (Y) fZ) (Y) (sin.) <br />Haul Route: 200 0.00 5.00 5.00 0.217 (CHB }~x) <br />Return Route: 10 0.00 5.00 5.00 0.022 (CHB }~x) <br /> Total travel tine = 0.239 <br /> Tota] cycle tine = 0.7ti9 Minutes <br />Loader Bucket Capacity <br />...................... <br />Rated Capacity= 5.75 LCY (heaped) <br />Bucket fill factor= 1.100 Other - cork/dirt ~iztures (100-1205) <br />Adjusted capacity= 6.33 LCY <br />Job Condition Correction Factors <br />Site altitude = 6,b00 ft. <br />Altitude correction factor = 1.00 (CHB rdh) <br />Job efficiency factor = 0.83 (lsh/day) <br />Net Correction = 0.83 Multiplier <br />Unadjusted Hourly Unit Production 493.65 LCY/Hr <br />Adjusted Hourly Unit Production 409.73 LCYJHr <br />Adjusted Nourly Fleet Production 409.73 LCY/Hr <br />JUB COST <br />Fleet size = 1 Loader(s) Total job tine = ]O.BS Nours <br />Unit rost = 50.231 /LCY Total job cost = f1,02B.00 ~ <br />