Laserfiche WebLink
etlof2 <br />C~do Division of Ninerals and Geology <br />ESTINATIH6 FORM - NHEEL LOADER NORZ <br />Task is 3 Prep. by: SSS Task Filename N148-3 <br />Date 02/21/95 Permit I:M-86-148 Nine: Measelskin <br />Permitting action :General 110121 tYPe permit bond recalculation <br />Task description : Aip facilities area 6 mined area south of lower pit <br />HOURLY EAUIPNENT CUSi <br />_____________________ Basic machine: CAT 980C Horsepower = 270 <br />Attachment I1: BOPS Cab Shift basis:l/day <br />(DO1 hke) <br />Cost Breakdown - Ownership = 241.11 <br />""""""" -Operating-loader = 532.03 100 Z utilization <br />- Operator = 521.58 <br />- Total cost/hr = 594.78 Total fleet cost/hr = 594.78 <br />NATERIAI QUANTITIES <br />initial Swell Final <br />volume = 4,444.0 LCY factor = H/A volume = 4,444.0 LCY <br />Auantity source/reference Assume 600' z 400' x .5'deep ripped w/bucket teeth <br />Z Swell sourcejreference : NA <br />HOURLY PRODUCTION <br />----------------- <br />----------------- <br />Loader Cycle Tiee <br />Unadjusted Basic Cycle Tiee (load, dump 6 maneuver) = 0.550 min. <br />(CHB mk') <br />Cycle Time Factors: <br />------------------- <br />Material- Mrzed material <br />Pile- Ho adjustment. <br />truck Ownership- No adjustment <br />Operation- Constant opera <br />Target- No adjustment <br />.............. <br />factor not. applicable <br />factor not applicable <br />ior~ <br />Factor not applicable <br />Net Cycle Time Adj. <br />Adj. Basic Cycle Time = <br />Factor Imin.i <br />0.020 (CH8 ede) <br />0.000 (CHB edal <br />0.000 (CHB eda) <br />-0.040 (CH8 eda) <br />0.000 {CHB eda) <br />-0.020 min. <br />0.530 nn <br />