My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18985
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:09 PM
Creation date
11/18/2007 9:28:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986148
IBM Index Class Name
Inspection
Doc Date
2/21/1995
Doc Name
WEASELSKIN PN M-86-148 ENCLOSED BOND RECALCULATION
From
DMG
To
WEASELSKIN CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HOURLY PRODUCTION cont'd Sheet 2 of 2 <br />----------------- <br />----------------- <br />Loader CYCIe Tife cont'd <br />Rolling Resistance ~, <br />Roadway underfooting conditions: ~i <br />Haul :Rutted dirt, little/no taint.,] -2' fire pen. <br />l <br />Return:Rutted dirt, littleJno taint.,l-2' fire pen. i <br /> Grade Rolling Total Travel <br />I <br /> Length Resist. Resist. Resist. Tife ~ <br />Haul 6 return Tife: (f t) (I) IS) lil (tin J i <br />Haul Route: 600 0.00 5.00 5.00 0.444 (CH8 }tx) <br />Return Route: E00 0.00 5.00 5.00 O.d45 (CHB wxy) <br /> Total travel fire : 0.945 <br /> Total cycle rice = 1.585 tinutes <br />Loader Bucket Capacity <br />Rated Capacity= 5.75 LCY (heaped) <br />Bucket fill factor= 1.100 other -rock/dirt fixtures 1100-12011 <br />Adjusted capacity= n.33 LCY <br />Job Condition Correction Factors <br />Site altitude = n,600 ft. <br />Altitude correction factor = 1.00 (CHB rdhl <br />Job efficiency factor = 0.83 Ilsh/day) I <br />-------- <br />Net Correction = 0.83 tultiplier <br />Unadjusted Hourly Unit Production 239.48 LCY/Hr I <br />.,..,... <br />Adjusted Hourly Unit. Production 198.11 LCYJHr <br />Adjusted Hourly Fleet Production 198.77 LCY/Hr <br />JOB COST I <br />Fleet site = ] Loaderis) Total job fife = 25.15 Hours <br />Unit cost : 50.471 JLCY Total job cast = 52,384.14 ~I <br />
The URL can be used to link to this page
Your browser does not support the video tag.