Laserfiche WebLink
<br />HOURLY PRODUCTION cont'd Sheet 2 of 2 <br />----------------- <br />----------------- <br />Loader CYCIe Tife cont'd <br />Rolling Resistance ~, <br />Roadway underfooting conditions: ~i <br />Haul :Rutted dirt, little/no taint.,] -2' fire pen. <br />l <br />Return:Rutted dirt, littleJno taint.,l-2' fire pen. i <br /> Grade Rolling Total Travel <br />I <br /> Length Resist. Resist. Resist. Tife ~ <br />Haul 6 return Tife: (f t) (I) IS) lil (tin J i <br />Haul Route: 600 0.00 5.00 5.00 0.444 (CH8 }tx) <br />Return Route: E00 0.00 5.00 5.00 O.d45 (CHB wxy) <br /> Total travel fire : 0.945 <br /> Total cycle rice = 1.585 tinutes <br />Loader Bucket Capacity <br />Rated Capacity= 5.75 LCY (heaped) <br />Bucket fill factor= 1.100 other -rock/dirt fixtures 1100-12011 <br />Adjusted capacity= n.33 LCY <br />Job Condition Correction Factors <br />Site altitude = n,600 ft. <br />Altitude correction factor = 1.00 (CHB rdhl <br />Job efficiency factor = 0.83 Ilsh/day) I <br />-------- <br />Net Correction = 0.83 tultiplier <br />Unadjusted Hourly Unit Production 239.48 LCY/Hr I <br />.,..,... <br />Adjusted Hourly Unit. Production 198.11 LCYJHr <br />Adjusted Hourly Fleet Production 198.77 LCY/Hr <br />JOB COST I <br />Fleet site = ] Loaderis) Total job fife = 25.15 Hours <br />Unit cost : 50.471 JLCY Total job cast = 52,384.14 ~I <br />