Laserfiche WebLink
C~ado Division of Minerals and Geology <br />ESTIMATING FOAM -WHEEL LOADER NORK <br />~eet 1 of 2 <br />Task t: 2 Prep. by: SSS Task filename : M148-2 <br />Date : 02/2(/95 Permit t:M-86-148 Nine: Neaselskin <br />Permitting action General 11012) tYPe permit bond recalculation <br />Task description : eackfill highwall remaining after bakfill of lower pit <br />HOURLY EAUIPNENT COST <br />------------------- Basic machine: CAT 980C Horsepower = 270 <br />attachment tl: ROPS Cab Shift basis:(/day <br />IDAI hkd <br />Cost Breakdown -Ownership - <br />'"""'""""'"' - Operating loader = <br />- Operator = <br />- Total cost/hr = <br />141.17 <br />532.03 100 X utilization <br />121.58 <br />594.18 Total fleet cost/tir = 594.78 <br />NATERIAL AUANTITIES <br />Initial Swell Final <br />volume = 5,000.0 LCY factor = N(A voLume = 5,000.0 LCY <br />Auantity source/reference : Assm. 400'z avg 15' highwall backfilled to 3:1 <br />Y Swell source/reference NA <br />HOURLY PRODUCTION <br />---------------- <br />--------------- <br />Loader Cycle Time <br />Unadjusted Basic CYCIe Time (load, dump 8 maneuver) = 0.550 miry <br />(CHB mk') <br />Cycle Time Factors: Factor (min.( <br />Naterial- Nized material 0.020 (CHB eda) <br />Pile- Conveyor or dozer piled 10 ft. high or 0.010 (CHB eda) <br />Truck Ownership- Ho adjustment - factor not applicable 0.000 fCHB eda) <br />Operation- Constant operation -0.040 (CHB eda) <br />Target- USER-PROVIDED TARGET FACTOR 0.100 (USER {; w) <br /> Net Cycle Time Adj.= D.090 min. <br /> Adj. Basic Cycle Time = 0.540 miry. <br />