My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18985
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:09 PM
Creation date
11/18/2007 9:28:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986148
IBM Index Class Name
Inspection
Doc Date
2/21/1995
Doc Name
WEASELSKIN PN M-86-148 ENCLOSED BOND RECALCULATION
From
DMG
To
WEASELSKIN CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-_.J <br />HOURLY PRODUCTION cont'd <br />----------------- <br />----------------- <br />Loader Cycle Tice cont'd <br />Rolling Resistance <br />Roadway underfootir~g conditions: <br />Haul :Rutted dirt., littleJno caint.,l-2' fire pen. <br />Return:Rutted dirt, little/no caint.,l-2' fire pen. <br />Grade Rolling Total <br />Length Resist, Resist. Resist. <br />Haul a return Tice: (ft) (S) (S) IS) <br />---------------------------------------------------------- <br />Haul Route: 200 -2.00 5.00 3.00 <br />Return Route: 200 2.00 5.00 7.00 <br />Total travel lice = <br />Total cycle the = <br />Loader Bucket Capacity <br />Rated Capacity= 5.15 LCY (heaped) <br />Bucket fill factor = 1.D50 Other - ooist. loac <br />.................. <br />Adjusted capacity= 6.04 LCY <br />Job Condition Correction Factors <br />Site altitude = 6,600 ft. <br />Altitude correction factor = 1.00 (CHB rdh) <br />Job efficiency factor = 0.83 (lsh/day) <br />Net Correction = 0.83 cultiplier <br /> <br />Sheet 2 of 2 <br />Travel <br />Tice <br />(cin.) <br />0.196 IGHB lcy) <br />0.213 (CHB wzy) <br />0.410 <br />0.910 cinutes <br />(100-1105) <br />Unadjusted Hourly Unit Production 398.22 LCY/Hr <br />Adjusted Hourly Unit Production 330.52 LCY/Hr <br />Adjusted Hourly Fleet Production 330.52 LCYJHr <br />JOB COST <br />Fleet size = 1 Loader(s) Total jab tiee = 35.63 Hours <br />Uriit cost = 50.287 /LCY Total job cost = 13,377.25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.