Laserfiche WebLink
-_.J <br />HOURLY PRODUCTION cont'd <br />----------------- <br />----------------- <br />Loader Cycle Tice cont'd <br />Rolling Resistance <br />Roadway underfootir~g conditions: <br />Haul :Rutted dirt., littleJno caint.,l-2' fire pen. <br />Return:Rutted dirt, little/no caint.,l-2' fire pen. <br />Grade Rolling Total <br />Length Resist, Resist. Resist. <br />Haul a return Tice: (ft) (S) (S) IS) <br />---------------------------------------------------------- <br />Haul Route: 200 -2.00 5.00 3.00 <br />Return Route: 200 2.00 5.00 7.00 <br />Total travel lice = <br />Total cycle the = <br />Loader Bucket Capacity <br />Rated Capacity= 5.15 LCY (heaped) <br />Bucket fill factor = 1.D50 Other - ooist. loac <br />.................. <br />Adjusted capacity= 6.04 LCY <br />Job Condition Correction Factors <br />Site altitude = 6,600 ft. <br />Altitude correction factor = 1.00 (CHB rdh) <br />Job efficiency factor = 0.83 (lsh/day) <br />Net Correction = 0.83 cultiplier <br /> <br />Sheet 2 of 2 <br />Travel <br />Tice <br />(cin.) <br />0.196 IGHB lcy) <br />0.213 (CHB wzy) <br />0.410 <br />0.910 cinutes <br />(100-1105) <br />Unadjusted Hourly Unit Production 398.22 LCY/Hr <br />Adjusted Hourly Unit Production 330.52 LCY/Hr <br />Adjusted Hourly Fleet Production 330.52 LCYJHr <br />JOB COST <br />Fleet size = 1 Loader(s) Total jab tiee = 35.63 Hours <br />Uriit cost = 50.287 /LCY Total job cost = 13,377.25 <br />