Laserfiche WebLink
<br />RECLAMATION COST SUIRA.ARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Task No.I <br />I <br />I <br />__________________________ <br />Task Description <br />_________________ <br />sheet 4 of 4 <br />I Cost 1$) <br />____________I____________ <br />I <br />I <br />_________________________ <br />Subtotal (K1: <br />____________ <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description ~ Cost ($) <br />________I________________ _____________y~____________I____________ <br />~eA++o/z tc~/e ~ sca/e ho.rre Goo 1 <br />o ~r ~c' doe I <br />iJZe,you~ 18 {/ fled o. r ~/s a i <br />I ¢:~e~rvi non-roacr°dlz~.ni~ e~~%P• i <br />Subtotal IL): <br />M. MI SCELLANEOIIS RECLAMATION TAS%S <br />Task No.~ Task Description I CosC ($) <br />________I________________________________________________.._____________ <br />I ~ <br />9 ~ Demol iC ion / / / / I $6,000 <br />10 ~ Seedrng0. WeGc7 LarJTry (~ /.2 QC~2S p'~W1j~~I $6,000 <br />~ Fencing ~ <br />11 ~ Mob/Demob I $1,875 <br />Subtotal (MI: 513,875 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): $32, 805 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD fi PROFIT <br />Item No.I Item Description <br />1. I Public Liability Insurance.... <br />2. I Contractor`s Performance Bond <br />3. ~ Cont ractor~s Profit........... <br />9. I Job Superintendent.. <br /> <br />______ <br />..___ I <br />_____ 0092 ($} <br />___________ <br />1.SSOk of I <br />dir. ~ $508 <br />1.550k cE dir. I 5506 <br />10.001 of dir. ~ $3,281 <br />Subtotal (A): 54,297 <br />TOTAL CONSTRUCTION CONTRACT AMO[D1T (direct p1US 0 fi P1: $37,102 <br />B. DMG PROJECT ADMIN ISTAATION E%FENSES <br />Item No.~ Item Description ~ Cost (51 <br />1. I Minerals Program Admin. Fee at S.OOt of cnt r. $1,855 <br />________________________________________________________________________ <br />NET INDIRECT COST PERCENTAGE: 18.761 Subtotal (H): 51, E55 <br />TOTAL INDIAECT RECLAMATION COSTS (subtotals A through H): $6,153 <br />TOTAL PERFORMANCE BOND AMOUNT (tlirect plus indirect cost9) 538,958 <br />