Laserfiche WebLink
• Colorado DiviS ion of Minerals and Geolo• <br />_________________________________________ <br />ESTIMATING FORM - BULLDOZER WORK <br />Task #: 2 Prep. by: TAS Task File Name: MO"19-2 <br />Dale: 0]/13/98 Permit #:M-86-079 Mine: M 6 G Pit <br />____________ _________ _________________________________ <br />Permit Action: Final Reclamation <br />Task Description: Backf ill SE lake shoreline from 2:1 co 3:1 slope <br />_____________________________________________________________ <br />HOURLY EQUIPMENT COST <br />_____________________ Basic Machine: Cat DBL Horsepower: 335 <br /> Blade Type: SEMI-UNIVERSAL -"_"'-'"" <br /> Attachment #1: ROPS Cab Shift Basis: 1/day <br /> Attachment #2: N A <br />__________ <br />Cost Breakdown: <br />______________ <br />UC it i2at ion t <br />Ownership cost/hr $33.69 N/A <br />Operating 4 overhaul cost/hr- dozer = $58.99 100 <br /> -ripper = $0.00 N/A <br />Operator cost/hr = $23.12 N/A <br />Total egpt. unit cost/hr $115.99 Total fleet <br />________ cost/hr : $115.]9 <br />________ <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 5,833.0 L CY Factor: N/A Volume: 5,833.0 LCY <br />Source of quantity ta ke-o Ef: program <br />________ <br />_________________________ <br />_____ <br />___ <br />___________ <br />Source of est. swell factor: permit <br />________ <br />_________________________ <br />_____ <br />___ <br />___________ <br />HOURLY PRODUCE ION <br />________________= Sob Condi Ci on Correction Factors <br />Avg. push distance: 60 ft. "--""'--"""-'""""- """ '- <br /> "'-""" Operator.......... 0 .]6 (avg.l <br />Unadjusted hourly Mat. consistency.. 1 .20 (Cat tbl) <br />dozer production: 16]0 LCY/hr Dozing method..... 1 .20 Is lo[1 <br /> "'_---" Visibility........ 1 .00 (avg.) <br />Material consistency: Job efficiency.... 0 .87 Ilsh/day) <br />Loose stockpile Spoil pile factor. 1 .00 (doz-oc) <br />'--""~'--"""---" ""---"'"~--"" Push 4radien[..... 1 .11 (Cat cbll <br />Avg. push gradient: 5.00 k lneg) ALtitude deration. 1 .00 ICat tbli <br /> "'-""" Material weight... 1 .94 ICat tbl) <br />Avg. site altitude: <br />_ 6000 ft. <br />________ Blade type........ <br />________________________ 1 <br />_____ .00 <br />___ (S or U) <br />Material weight 1600.00 16/LCY Net Job Correction 1 .44 <br />Mat. Des cr.: _ ________ ___ _____ ___ <br />Top Soil <br />_____________________ <br />________________ Adjusted Unit Prod.: <br />___ 2399 <br />_____ .95 <br />___ LCY/hr <br /> Adjusted Fleet Production: 2399 .95 LCY/hr <br />JOB COST -" """~- "' <br />Fleet size : <br />_ 1 Dozer ts) <br />_______ Total Job Time: <br />___ 2 <br />_____ .43 <br />___ Hours <br />Unit Cosc $0.048 /LCY Total Job Cosc: $281 .31 <br />