Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd <br />H. EARTHWORK <br />Task No.l <br />________I______ <br />I <br />I <br />I <br />I. EARTHWORK <br />Task No. <br /> <br />sheet 3 of 4 <br />STREAM CHANNEL RECONSTRUCTION <br />Task Description I Cost I$) <br />_________________________________________I_________. <br />I <br />I <br />I <br />Subtotal (H1: <br />DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task Description Cos[ 151 <br />Sub[o [al (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No. Task Description Cost ($) <br />__.,_____I__________________________________________________I____________ <br />] Haul 11,0]9 cu.yd. topsoil; scraper ® $0.50/cu.yd $5,53] <br />I I <br />B I Res pread 11,0'19 cu. yd. topsoil I $2,329 <br />I I <br />I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />Subtotal ~J): $],866 <br />