Laserfiche WebLink
<br />Section II (continued) <br />Page 2 - <br /> <br />4.09 Disposal of Excess Spoil and underground Levelopment Waste <br />There was a very small pile of shaley material from mine development waste on <br />the bench. This pile is less than 1 truckload, storage of which has been approved. <br />4.I2 Slides and Other Damage <br />On February 25, 1982, Blue Ribbon reported small slides at the southern edge <br />of the mine bench and the face-up highwall above the diversion. During the inspection, <br />it was noted that the operator had reestablished the berm at the bench outslope and <br />was considering remedial action at the face-up. The operator should consider leaving <br />the remaining sloughed material from the highwall as is until a long-term solution to <br />the problem is resolved during the permit application process. <br />5.02.4 Availabilitu of Records <br />The required NPDES monitoring reports are held on-site in the mine office. <br />Blue Ribbon Coal Company should be aware that all monitoring records and reports must <br />be on file for public use in the area of mining (5.02.4(1)). The location of this file <br />will be determined through the permitting process. <br />