Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ BASIN RESOURCES, INC. Permtt C-013-81 Field Visit 09/22/2000 Continuation Page <br />Person Number Date <br /> <br />Codes: 28. Performance Standard Categories <br />I=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Idcnlifed ewhere, 6=~Previou~ly Cited <br />A. Administrative D. BackfilGng & Grading H. Subsidence Control Plan <br />I. _ Mining within Valid Permit I._ Exposed Openings - <br />I <br />Roads <br />2. - Minin within Bonded Area <br />B 2._ Contemporaneous Reclamation . <br />I. <br />Road Construction <br />3. -Terms & Conditions of Permit 3._ Approximate Original Contour _ <br />2. Certification <br />4. -Liability Insurance 4._ Highwall Elimination Drtinage <br />3. <br />5. _ Ownership and Conuol S.-Steep Slopes (includes downslope) _ <br />4. <br />Surfacing and Maintenance <br />6. _ Temporary Cessation 6._ Handling of Acid & Toxic Materials _ <br />5. Reclamation <br />7. _ AML Rec. Fees -- Non-Respondent 7.-Stabilization (rills and gullies) - <br />J. Signs & INarkers <br />8. _ AML Rec. Fees -- Failure to Pay E. Excess S oil Dis osal <br />P <br />c 1. <br />Signs <br />B. Hydrologic Balance 1.- Pla <br />ement _ <br />2. <br />Markers <br />l. _ Drainage Control 2._ Drainage Control _ <br />IG Distance Prohibitions <br />2. _ Inspections & Certifications 3._ Surface Stabilization - <br />L. Revegetttion <br />3. _Siltation Structures 4.-Inspections & Certifications Vegetative Cover <br />I. <br />4. _ Discharge SWClures F. Coal Mine Waste - <br />Timing <br />2. <br />5. _ Diversions (Refuse Piles/Impoundmeots) _ <br />Po::tmining Land Use <br />M. <br />6. _ Effluent Limits I._ Drainage Control - <br />7. _ Ground Water Monitoring 2.-Surface Stabilization N. Other <br />8. -Surface Water Monitoring 3.-Placement Genefal <br />9. _ Drainage -- Acid-Toxic Materials 4._ Inspections and Certifications PeAOrmance <br />10. -Impoundments 5._ impounding Structures CatagOry <br />Il. _StreamBufferZones G. Use OfF,xplosives' <br />~ ~.]0.~(1) n, b, 4 e <br />~ I) <br />C. Topsoil & Subsoil l._ Blaster Certification <br />-- - <br />I. _Removal 2._ Distance Prohibitions 2) <br />2. _ Substitute Materials 3._ Blast Survey/Schedule - - <br />3. _ Storage and Protection 4._ Warnings & Records 3) <br />d padicr.:6„Knn 5. Control of Adverse Effects - _ <br /> Performance Standard Categories E. Excess Spoil Disposal ...........................................(816/817.71-74) <br /> 30 CFR Counterpart I. Placement ................................................................ ...........................71(e) <br />A. Administrative .................................. ........................... ........... 2. Drainage Controt .................................................... ............................71(0 <br />1. Valid Pemut .................................................... .................................773.11 3. Surface Slabrlrzalion............................................... ............................71(B) <br />2. Mining within Bonded Area .................. ..............................773.1 l 4. Inspections & Cerifica[ions................................... ............................71(h) <br />3. Terms & Conditions of Permit ............... ..............................773.17 F. Coal Mine Waste (Refuse Piles/Impoundlmenrs) ,••••(g16B17.81-84) <br />4. <br />5. Liability Insurance .................................. <br />Ownership and Control .......................... ..............................800.60 <br />............................778.13 <br />1. <br />Drainage Conuol ................................................... <br />............................83(a) <br />6. Temporary Cessation .............................. 842.11(e) & 816/817.131 2. <br />3 Surface Stabilizerion............................................... <br />Placement ...........................83(6) <br />83(c) <br />7. AML Rec. Fees -- Non-Respondent ....... .........................870.1 S(b) . ................................................................ ........................... <br />8. AML Rec. Fees -- Failure [o Pay ........... ..........................870.15(a) 4. Inspections and Cenifications................................. ..........................83(d) <br /> 5. Impounding Swctures............................................ ...............................e4 <br />B. Hydrologic Bslance ........................... ...........(816/817.41-57) <br /> G. Use of Explosives ..................................................(816817.61-68) <br />1. <br />2. Drainage Control .................................... <br />Inspections&Certifications ................... .....................................45 <br />..........................49(a)(10) <br />1. <br />BlasterCertification................................................ <br />...........................61(c) <br />3. Siltation Swctures ................................. .....................................46 2. Distance Prohibitions.............................................. ...........................61(d) <br />4. Discharge Structures ............................. ......................................47 3. Blast Survey/Schedule............................................ ...........................62-64 <br />5. Diversions .............................................. .....................................43 4. Wardngs & Records .............................................. ........................66 & 68 <br />6. Effluent Limits ....................................... .....................................42 5. Control of Adverse Effects..................................... ................................67 <br />7. Cround Water Monitoring ..................... .................................41(c) H. Subsidence Control Plan.........................................(817.121-122) <br />8. Surface WaterMonitoring ..................... .................................41(e) 1. Roads.................................................... . ...(816817.150-151) <br />9. Drainage--Acid-Toxic Materials .......... .................................41(q , <br />10. Impoundments ....................................... .....................................49 I. Road Constmcuon.................................................. .........................I50(c) <br />I I. Stream Bu((er Zones .............................. .....................................57 2. Cerification............................................................ ..........................I51(a) <br /> 3. Drainage .................................................................. .............150(6)-ISI(d) <br />C. Topsoil &Subsoil .............................. .................(816817.22) 4. Surfacing and Maintenance.................................... ..............I50(e)-I51(d) <br />1. Removal ................................................. .................................22(a) 5. Reclamation............................................................ ..........................150(1) <br />2. Substitute Materials ................................ .................................22(c) J. Signs & Markers .......................................... .............(816817.11) <br />3. Storage and Protection ........................... ..................................22(c) <br />4. Redistribution ......................................... .................................22(d) I. Signs....................................................................... ..............ll(a),(b).&(c) <br /> 2. Markers ................................................................... ...ll(a).(b).(d)~(e),&(0 <br />D. Backfilling & Grading ................... ...........(816817.95-107) ~ Distance Prohibitions................................... ....................(761.11) <br />~. Exposed Openings .....................616/817 .13, 14, I5, & 823.1 I & 21 L. Revegetation........................... <br />•••••••••••••••••••••• <br />•••• 816817.111-116) <br />_. Contemporaneous Reclamation .............. ....................................100 <br />3. Approximate Original Contour ............... ...........................102(a)(I) I. Vegetative Cover.................................................... .... ...........111 & 116 <br />4. Highwall Elimination .............................. ...........................102(a)(2) 2. Timing.................................................................... ..............................113 <br />5. Steep Slopes (includes downslope) ......... ...................................107 M. Postmining Land Use.................................. ............(816/817.133) <br />6. Handling o(Acid & Toxic Materials ...... ................................102(c) <br /> <br />7. <br />Stabilization(rills and gullies) ................ <br />..................................95(6) pa e 2 of <br />rs,.u~onrme~, a,iws B <br />