Laserfiche WebLink
~~~ U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />~° Mine Site Evaluation <br />SEP 2 7 ~~~te Program <br />Pemtittee/Person <br />..,.~~iwr ut mlrrerals 8 Geology <br />BASBV RESOURCES, BVC. <br />2. Address <br />3800 COUNTY ROAD 63.9 <br />3. City 4. State <br />Trinidad CO <br />5. Zip Code 6. Phone Number <br />81082 (719)846-2427 <br />7. Operator Name, if Different than Permi[lee <br />8. Mine Name <br />GOLDEN EAGLE <br />9. Permit Number <br />C-013-81 ~ 10. Permit Type <br />PP <br />I I. Field Visit Date <br />09/27!2000 12. Purpose <br />CCF , 13. SRA Present <br />~N <br />mm-dd -yyyy <br />14. Permit Status <br />A~ l5. Site Status <br />Pl 16. Facility Type <br />B~ <br />17. OSM Office # <br />140 l8. CCID # <br />CC93-(120-008 • 19. Land Code <br />SF <br />20. M.S.H.A ID # <br />05-02820 21. State A,brev. <br />CO 22. County Name <br />LAS <br />23. AVS Permittee En tity ID Numlx:r 24. State Office <br /> 103972 <br />25. Hours <br />8.0 a. Perini[ Review 26. Si tore Block 27. Reviewing Official: <br />~,~ ,iy <br /> <br />6.0 b. Site Visit Time Si lure: <br />HENRY A STIN ID # 116 ;signature: <br /> 9 <br />6 <br />10.0 c. Travel Time <br />Printed Name: Lt~il(p/~ / 0 0 <br />/2 <br />Review Date: ~ <br />mm - dd - yyyy <br />2.0 d. Report Writing Date: 09/26/2000 ` Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program. PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Cortiplaint Refertal (non site visit) <br />Oxx... Oversight RFx.... Reclamation Fees CC...... Citzen Cortiplaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... CiOZen Cortiplaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time dudng the review of the mine site. <br />Permlt Status - ttem 14 AB.. <br />A.... Active: Coal mining and reclamation activities occurting or <br />ppaartnitted but not yet disturbed. AB7 <br />IN....Inactive (Permanent Program Permit): Phase II completed or <br />Temporary Cessation of Operations. (Interim Program Permit) AB: <br />Coal mininc completed and reclamation activities initiated. <br />All surface and underground opal mining activities have ceased end <br />IeR t))he site without completing reclamation as defined in <br />ure~gBond forfeiture officially in proaiss or completed, and. <br />In proggress or not yet commencetl. <br />farmetl Forfeiture: Forfeited site where all bonds have been <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, tolled the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has ggranted pperformance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 GFR 616/ tlon of forfeited site is in progress. <br />have not begun. 617.t37(b). FR.. Forfeited .and Reclaimed: Forfeiture <br />AP.. Active Coat Producing: CAaI surface mining P1...Phase I RRelease: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is pertnittod but there is no bond. <br />ladliryry such as tipple or preparation plant P2.. Phase II Release: At least Phase II bond release WC.W~Idcat: Coal mining and reclamation <br />NM..No Mning: The Permit Status is active, site is for the entire permitted area. operation:; have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the adivib/ is not covered by the <br />mining achrt~, and site not r~raded. the RA has released all bond. required F~ermifs from the RA. <br />Facility Type Codes -Item 16 O...Ancillary (Haulroad, Conveyor, and/or Rails) H...Ezploration Permits L... Remining site ppermitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR765.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockp9es K...Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Easiness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement a~ tivities and rate each a enc 's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page I of <br />and wish to comment on the enforcement or compliance activities o(OSM, call I-888-REG-FAIR (1-888-734-3247). a~.;,N o~.<mk, a, ivv <br />