Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 07a State :Colorado Permitfjob # : M-2000-032 <br />Date : 19.1un-2003 <br />User : SSS <br />County :Mesa <br />Site :Monument View Gravel Pit <br />Agency or organization name :DMG <br />Permit or other job action :Routine Bond Recalculation <br />Task description :Compact sediment pond bac~ll <br />HOURLY EQUIPMENT COST <br />Machine description :CAT 825G <br />Compactor type :Reclamation <br />Horsepower: 315 <br />Shift basis : 1 perday <br /> Utilization % Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : $66.46 NA <br />OperatingcosUhour : $56.41 100 <br />Operator cosUhour : $30.65 NA <br />Total unit wsUhour : $153.52 Total fleet cosUhour : $153.52 <br /> <br /> <br />MATERIAL QUANTITIES <br />Loose Shrinkage Compacted <br />volume : 5,000 LCY factor : 0.820 volume : 4,100 CCY <br />Source of estimated volume :Exhibit L <br />of estimated <br />HOURLY PRODUCTION <br />factor :CAT Handbook <br />Unadjusted hourly production = (W x S x L x Cl / P <br />Compacted width per pass (V1n <br />Average compactor speetl (S) <br />Compacted thickness of each lift (L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />7.38 feet <br />4.00 mph <br />24.00 inches <br />16.3 (5,280 ft./12 in./27 cu.ft.) <br />Unatljusted hourly unit production : 2,887.06 CCY/hr <br />Job Condition Comection Factors Source <br />Site altitude : 4,550 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency factor : 0.83 (1 shilt/day) <br /> Net job correction : 0.83 multiplier <br /> Adjusted hourly unit production : 2,396.26 CCYihr <br /> Adjusted hourly fleet production : 2,396.26 CCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 1.71 hours <br />Unit cost : $0.064 per CCY Total job cost : $263 <br /> `~ <br />Abbreviation :none <br />Filename : M032-07a <br />