My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC15402
DRMS
>
Back File Migration
>
Inspection
>
INSPEC15402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:48 PM
Creation date
11/18/2007 9:10:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
Inspection
Doc Date
6/19/2003
Doc Name
Inspection Report
From
DMG
To
M.A. Concrete Construction Inc.
Inspection Date
5/13/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 06a State :Colorado <br />Date : 06/19/2003 County :Mesa <br />User : SSS Site :Monument View Gravel Pit <br />Agency or organization name :DMG <br />Permit or other job action :Routine Bond Recalculation <br />Task description : BacMill settling pond <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $45.63 NA <br /> Operating cost/hour : $90.29 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cosUhour : $30.65 NA <br /> Total unit cost/hour : $166.57 Total fleet cosUhour : <br />- $166.57 <br /> _ <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 LCY factor : NA volume : 5,000 LCY <br />Source of estimated volume :Exhibit L <br />Source of estimated swell factor :NA <br /> <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted howdy production : 2,110.5 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 7.00 % (r <br />Average site altitude : 4,550 feet <br />Material weight : 2,800 Ibs/LCY <br />Weight description ; <br />Clav-Natural bed <br />Operator skill : 0.75 <br />Matedal consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.16 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net correction : 0.52 <br />Adjusted unit production : 1101.41 LCYlhr <br />Adjusted fleet production : 1,101.41 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 4.54 Hours <br />Unit cost : $0.151 /LCY Total job cost : $756 <br />~~ <br />PermiUjob# :M-2000-032 <br />Abbreviation :none <br />Filename : M032-06a <br />
The URL can be used to link to this page
Your browser does not support the video tag.