My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC15402
DRMS
>
Back File Migration
>
Inspection
>
INSPEC15402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:48 PM
Creation date
11/18/2007 9:10:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
Inspection
Doc Date
6/19/2003
Doc Name
Inspection Report
From
DMG
To
M.A. Concrete Construction Inc.
Inspection Date
5/13/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER_ONLV WORK <br />Agency or organization name : DMG <br />Task # : 058 State :Colorado Pennitlob # : M-2000-032 <br />Date : Or/19l2003 County :Mesa Abbreviation :none <br />User : SSS Site :Monument View Gravel Pit Filename : M032-05a <br />Permit or otherjob adion :Routine Bond Recalculation <br />Task description : HeUI OnSlt@ fill t0 pit, <br />HOURLY EQUIPMENT COST <br />and <br />Model : Cat 633E Series 2 Shift basis : 1 per day <br />Cost Breakdown : Job utilization °h Horsepower : 490 <br />Ownership cosUhour : $72.62 NA Weight (UST) : 56.34 <br />Operating cost/hour : $110.00 100 Cost data source : (CRG) <br />Operator wsUhour : $30.84 NA <br />Total unk cosVhour : $213.46 Total fleet cosUhour : $426.92 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 18,600 LCY fador : NA volume: 18,800 LCY <br />Source of quantity takeoff :Exhibit L <br />Source of estimated swell fador :NA <br /> <br />HOURLY PRODUCTION <br />Haulino Capacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight: 2,400 pounds/LCY Struck volume: 23.20 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Clay and gravel -Dry Average volume : 28.60 LCY <br />Rated payload : 82,000 pounds <br />Payload capacity : 34.17 LCY Adjusted capacity : 28.80 LCY "' <br />Cvcle Time (load + haul + spread + return) : Loading time : 0.90 minutes' <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : ~ ioedirg gme ver pao- on peel*wu motleie <br />Route ~ Distance (feet) Grade (°k) ~ Roll. res.(%) ~ Total res.(°k) Velocity (fpm) Travel time (min.) <br />Haul: 900 -0.6 5.0 4.4 1,635 0.55 minutes" <br />Return: 900 0.6 5.0 56 1,975 0.46 minutes° <br />"travel lime adjusted fa acceleration end deceleration al loatl and tlumD poirrts <br />velorAtiea ere maz. ellaineble per total res istance Shown, not average Total cycle time 2.61 minutes <br />Job Condkion Corradion Factors <br />Site altitude (feet) : 4,550 Adiusted Hourlv Production <br />Altitude adjustment fador : 1.00 (Cat HB) Unadjusted unit production : 658.44 LCYMour"' <br />Job efficiency fador : 0.83 (1 shilt/day) Adjusted unit production : 546.51 LCY/Hour <br /> Adjusted fleet production : 1,093.01 LCY/Hour <br />Net job correction fador : 0.83 -2 bmea volume on puan-Dun moaels <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Scraper{s) Total job time : 17.02 Hours <br />Unit cost : $0.391 /LCY Total job cast : $7,285 <br /> ~_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.