Laserfiche WebLink
CIRCES Cost Estimatinsr Software <br />SCRAPER - (]NLY WORK <br />Agency or organization name :DMG <br />Task # : 098 State :Colorado PenniVjob # : M-2000-032 <br />Date : Ofiv192003 County :Mesa Abbreviation :none <br />User: SSS Stte:MOnumenf View Gravel Pit Filename :M032-09a <br />Permit or otherjob action :Routine Bond Recalculation <br />Task description : Repl¢Ce [OpSO%I OVB! 8ff8C[¢d d!¢8 <br />Model :Cat 633E Series 2 <br />Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 490 <br />Ownership cost/hour : $72.62 NA Weight (UST) : 56.34 <br />Operating cosUhour : $110.00 100 Cost data source : (CRG) <br />Operator cosUhour : $30.84 NA <br />Total unit cosf/hour : $213.46 Total Fleet cosVhour : $426.92 <br /> <br />MATERIAL QUANTITIES <br />Inttial Swell Loose <br />volume; 17,477 LCY factor : NA ~ volume: 17,477 LCY <br />Source of quantity take-off :Exhibit L <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION <br />Hauling Caoacttv <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Matedal weight : 2,100 pounds/LCY Struck volume : 2320 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth -Loam Average volume : 28.60 LCY <br />Rated payload : 82,000 pounds . <br />Payload capacity : 39.05 LCY Adjusted capacity : 28.60 LCY "' <br />Cvcle Time (load + haul + spread + rotuml : Loading time : 0.90 minutes' <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time: •tvaainpWnepe,paronP°,n~pnln~al: <br />Route Distance (feet) Grade (%) Roll. res.(°k) Total res.(°h) Velocity (fpm) Travel time (min.) <br />Haul: 400 0.0 8.0 8.0 835 0.48 minutes" <br />Retum: 400 0.0 8.0 8.0 1,453 0.28 minutes" <br />"Navel time aajuslea for acceleration arM tleceleretion at loea ena dump points <br />velocitlea are ~. akamaoie par twat resistarrce shown, ~ average Total cycle time : 2.35 minutes <br />Job Condition Correction Factors <br />Site attitude (feet) : 4,550 Adiusted Hourlv Production <br />Akitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 728.87 LCY/Hour"' <br />Job efficiency factor : 0.83 (1 shilt/dey) Adjusted unit production : .604.96 LCY/Hour <br /> Adjusted Fleet production : 1,209.92 LCYMour <br />Net job correction factor : 0.83 "' z rmes volume on push-pw~ moaela <br />~- ~~ <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) Total job time : 14.44 Hours <br />Unit cest : $0.353 ILCY Total job cost : $8,167 <br /> ---~ <br />