Laserfiche WebLink
<br />HOURLY PRODUCTION cont'd Sheet 2 of 2 <br />Loader CYCIe Time cont'd <br />Rolling Resistance <br />Aoaduay underfooting conditio ns: <br />Haul :Soft, rutted dirt, no. maint.,4-%' tire pen . <br />Return:Soft, rutted dirt, no. maint.,4-6' Lire pen . <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Time <br />Haul 6 return Time: <br />------------------ <br />- (ft) <br />------ <br />- (Z) (Y1 <br />---- <br />-- <br />- iYi (min.i <br />- <br />Haul Route: --- <br />45D --- <br />------ <br />----- <br />O.OD 1.50 ---------- <br />7.50 --------- <br />0.537 - <br />(CN8 }mzl <br />Return Route: 450 0.00 7.50 7.50 0.435 (CH8 wxy) <br /> Total travel time = 0.97t <br /> Total cycle time = 1.431 minutes <br />Loader Bucket Capacity <br />Rated Capacity= 2.25 LCY (heaped} <br />Bucket fill factor= 1.050 Other - moist loan (100-1102) <br />Adjusted caparitl= 2_3e LCY <br />Job Condition Correction Factors <br />Site altitude = n,600 ft. <br />Altitude correction factor = 1.00 (CHB rdh) <br />Job efficiency factor = 0.83 (lsh/daYl <br />Net Correction = 0.83 multiplier <br />Unadjusted Hourly Unit Production 99.03 LCY/Hr <br />Adjusted Hourly Unit Produrtior~ :2.20 LCY/Hr <br />Adjusted Hourly Fleet Production X2.20 LCY/Hr <br />JOB COST <br />Fleet sire : 1 Loaderlsl Total job time = 2.ti1? Hours <br />Unit cost = SO.beO /LCY Total job cost = 5123.19 <br />