Laserfiche WebLink
heel 1 of 2 <br />~rado Division of Minerals and 6eoloyy <br />ESTIMATING FORM - NNEEL LOADER NORK <br />----------------------------------- <br />cask t: 3 Prep. bY: SSS Task filename : N165-3 <br />Date : 02/22(95 Permit I:N-86-1ti5 Mine: Nilloa Bend <br />Permitting action 1l0 bond recalculation ` <br />Task description : regrade mining area <br />HOUALY EQUIPMENT COST <br />--=-=-=-=--=--=-=---= Basic machine: CAT 926E Horsepower = 110 <br />Attachaent tl: ROPS Cab Shift basis:l/day <br />(DQI hkm) <br />Cost Breakdown - Ownership - 112.3; <br />""""""" -Operating-loader = 512.07 100 I utilization <br />- Operator = S21.5B <br />- Total cost/hr = 546.02 Total fleet cost/hr = 546.02 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume = 2,420.0 LCY factor = N/A volua~e = 2,420.0 LCY <br />Quantity source/reference : 1.Sac w la[.ft./at. <br />x Swell source/reference : NA <br />HOURLY PRODUCTION <br />---------------- <br />----------------- <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dump 6 maneuver) = 0.470 min. <br />(CHB ek') <br />Cycle Time Factors: Factor (min <br />Material- Nixed material 0.024 (CHB eda) <br />Pile- Conveyor or dozer piled 10 ft. high or 0.010 ICHB eda) <br />Truck Gwnership- No adjustment - factor not applicable 0.000 ICHB eda) <br />Operation- Constant operation -0.040 ICHB eda) <br />Target- No adjustment - factor not. applicable 0.000 (CH8 edal <br /> Net Cycl e Time Adj.= -0.010 min. <br /> Adj. Basic Cycle time = 0.460 min. <br />