Laserfiche WebLink
..•' eet 1 of 2 <br />C~ado,Div::ion of Minerals and`6eology <br />.. ... .... ... .. <br />ESTIMATIH6 FOAM - NHEEL LOADER WORK <br />Task t: 2 Prep. bY: SSS Task filename N165-2 <br />Date : 02/22/95 Permit t:N-86-165 Mine: Nillow Bend <br />Penitting action l10 bond recalculation <br />~ Task description :replace and regrade topsoil on road <br />HOURLY EQUIPMENT COST <br />--- - ------~--- Basic machine: CAT 926E Horsepower 110 <br />Attachment tl: ROPS Cab Shift basisa/day <br />(DAI hkll <br />Cost Breakdown -Ownership = 512.38 <br />""""""" - Operating-loader = 512.07 100 Z utilization <br />- Operator = 521.58 <br />- Total cost/hr = =46.02 Total fleet cost/hr : 246.02 <br />MATERIAL AUANTITIES <br />Initial Swell Final <br />volume : 220.0 LCY factor = N/A volume = 220.0 LCY <br />Auantity source/reference : 991'x12'x.5' <br />I Swel) source/reference NA <br />NDURLY PRODUCTION <br />Loader CYCIe Time <br />Unadjusted Basic Cycle Time (load, dump ~ maneuver) = 0.470 min. <br />(CHB mk') <br />Cycle Time Factors: Factor (min.) <br />Material- Mized material 0.020 (CHB eda) <br />Pile- Conveyor or dozer piled IO ft. high or 0.010 (CHB eda) <br />Truck Ownership- No adjustment - factor riot applicable 0.000 (CHB eda) <br />Operation- Constant operation -0.04D (CHB eda) <br />Target- Nominal target 0.000 (CHB eda) <br /> Net Cycle Time Adj.= -0.010 miry. <br /> Adj. Basic Cycle Time = 0.460 min. <br />