Laserfiche WebLink
:\ portion of Ihr \\ astc I)ispusal :\rea I ha, t+econ,r more of an impoundmrnt Ibr underground mining <br />oprntions.:utd thus nerds to I,r su recognized and prrntitted under the revised ndcs as an impoundmrnt (Rule <br />4.05.9). <br />1'hr other two bodies of ++atcr fur ++hich cl;usitications wrr-• <br />reviewed arc morn closrh associated with the coal <br />preparation plant Isre picture to the righU. <br />The body of water to the upper right in the picture to the <br />right is a sediment trap nurgrul IU a dntinage ditch lscr the <br />picu,re helo+v) that discharge, into Sr.timrnt Pond b. Phis <br />in-ditch-lint sediment trap, in inunrdiate proximity to coal <br />and coal waste sattagr opcruiuns. ++as prmtitted under the <br />general provisions of Rules 4A5.? and 4.05.5 to irttrrccpt <br />srdin,rnt loading to the downstream Sedimentation Pond C <br />Iprmtilted under Rule 4.OS.h), <br />Port ul'thr <br />I hickenrr underllu++ is pumped into the undergnxutd +vorks. <br />lltr lu+cer Iet't body of+vatcr in the picture abavr is a sump <br />that +vas originalh prrntittrd tier entrrgrncy cuntainnunt of <br />thickener (I':\P, pugs ?.lli-301. Nu description was tiumd in <br />the PAP for Ihr current procedure of recycling thickener tank <br />dreanl into dtr sump and bark to the wash plant Ipun,p n1 <br />barrel tluats)(sec the picture helu+vl.:\ny uvrrtlo+v nfderu,t <br />term this swap, ur thickrnrr. is (ur can hcl directed to <br />Scdinuntutiun fund D.:\s this sump is used as ;u, <br />impoundmrnt, it nerds to br permitted under the provisions of <br />ftulr -Lt)i,9. <br />Ihr operator was advised that the lagoons of Ihr <br />sanitary suwugr treatment plant, and the rvalxuativc <br />lagoon at the Dish Creek Tipple, are now considered <br />imptnuxln,ents. and need a, he inspretal accuntingl}. <br /> <br />('oal mine waste ++as hying placed and ++urkrJ in the <br />waste disposal pile in compliance with the 1':\P. 1 he <br />rntbunkment hnd been cuntigurrd to prcveut +vatcr <br />Gom flowing over the fare of the stnlcutrr. l.arer areas <br />had been graded with the intent to back slope the upper <br />surface. <br />'fOPtil )II. <br />During the inspection o1'.tuly I _'. 2004, a requirement to re-establish vegetation cover. re-erect silt Cencrs. ur <br />provide other pnnrctive measures to the topsoil storage pile at the North West Mains Ventilation Shutt sift <br />was identified. Nettleton advised during the :\ugust 12. _'lI1W insprctinn that the storage pile +vas scheduled <br />+a:11!p l 1' In.prclnm ul IkIPIiCf 2M. :rNll Pagt h nfA MFG. r,li++ <br />