Laserfiche WebLink
July 12. 2l)0d ~ Rubs •l.l);?(I 1. d•OS '13tlut. and -Li1~.21?Ilh)ti II. Ihe currant plan is to accuntpli~h a <br />dinxntstrniun for this small area to detemtine if detention on the surtitci mtd rock check dams tcould hi <br />adequate. l hire teas nu indication :u thi lino of this inspxction that drainage Imm this disturltid area <br />contributed additional suspended solids alxtve natural conditions to, or did nut meet taatir yuuliq standards <br />of: reciieing streams. <br />Vu design ur demonstration ul currant sediment control measures is in thi PAP ti+r thi ('Y('C utiici urea. but <br />such was tinnul ht I tvingmili in the tbmtrr ('Y('(' Ixnnit. liptracts of the CY('(' prmtit arc to hi <br />incurpurxtid inw this current Fuidrl Creek ~9ini Pr\P. ibis item was lust idintilird during the inspection of <br />,luly 1 ~. 20114 I Rules •1.0i.?(I ). •l.tl~ '1.311x1. and a.0i.'_l31lhllill• <br />~o design ur demonstration of an appropriate sediment control ntixsure is in the P~\P for Qti "I rudys" corner <br />storage and training area sites This item was lust idrntiticd during the inspection afluh 12, _'UUd Iliulcs <br />~1.0~.'_I 11. 1.11>?(3)Ix), and 4.IIj?(3}(hllill• and came about tthen Pond :\, to tthirh this site drains, was <br />remmrd from the Permit. Preliminxn anahsis indiaurd shat grass litters tiff this small area might sullici, <br />and a demonstration titr such is undenvu~ for inclusion in the P:\P. I his site teas not inspirtrd During this <br />inspection. <br />The ruck chick dam ;tnd sidintint trap of the scdimint control measure at the ~ 7 North Esrapi Shali had <br />tilled tt ith .edintint. I~his item ttas first idrntiticd during the inspection of July I'_, 2O0-l IRules d.U~?l l 1. <br />d.OS.2r +tlal. and ~1.115.2(311hryi)I. ('accretive maintenance action was. as rcpartcd by the olxrator, underway. <br />but thi sire ttas nut inspected during this inspection. <br />Thi classiliiatiuns o(Ihrei txxlies of ttxtir un the mint site <br />wire rcviiwrd during this inspection. One of these wx.. xt the <br />\\'asie I)iax+sal Attu I .Another tvas :tn :trees of Ditch l)-2. <br />the third teas a sump associated with the prcxessing plant. <br />.1n r~ratatiun divrlopid at the \\';tstr I)islxtsal Area I (ue <br />picture k+ the right) us "low quality" coal was withdrutvn :utd <br />processed thrc+ugh the caul ttxsh plant (this processing plmti <br />wui appn+trd in 199$). Surface rnnutTtram the contributing <br />wutershid and spoil spring: sops collected in the i~caeation. <br />A channel was installed at a lute point in the remnant <br />hightvall Iscc page 2.(ti.9G of the PAP) to direct ttxter from <br />this excavation to Pond D Ipagr'_.I)i-97.2 of the PAI'1.:1 <br />culvert ttas installed in the channel to accommudati the <br />rrlucation of the \\'xste Dispu,ul ;\rcx 1 work mad discussed <br />under ROAllS atxwr. <br />I he reception of mine water pumped from tine 109 into the <br />i~cacatiun ;u the 1Yasti Disposal :\rra I site was perntitted <br />(P:\P. page 2Ai-97.'_) along with x m;utagrment plan tier the <br />combined waters in the ixrttatiun. \1'ater could hi pumped <br />Iscc picture w the right) Innn the ixcatatiun in any ufthrie <br />dirictiuns, ur a combination of them (ht the preparation plant. <br />hack into the minx. or dischsrgcd to Foidcl Crick). <br />I~RLiIk. CI'In?~tilem .a?A'r.~r .K. :IN41'aNC3ot8 ra _~• IN 4N <br />