Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: ~4-~~~-n» <br />INSPECTION DATE: Haim/n.~ INSPECTOR=S INITIALS: I(AP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. During the inspection, it was discovered that there was only one boundaN marker present Ob / 23/ 03 <br />to identify the permit area. This is a possible violation of 3.1.12 (2) of the Construction <br />Materials Rules and Regulations, for failure to mark the boundaries of the affected area by <br />monuments or other markers that are clearly visible and adequate to delineate such <br />boundaries. <br />PB or PV: ~B_ <br />TOPIC(S): ~~ <br />Corrective Action: Post the apprOpljate boundary markers at the boundaries of the eo rmit - - - <br />nran within 30 dnys of receipt of this in ~nactian ranarf and send nhatas to DMC~ far <br />varifinntlnn <br />2. During the inspection, it was discovered that there was no stockpile of topsoil at the site, 07 / 23/ 03 <br />which would be used for reclamation of the site. This is a possible violation of 3.1.9 (1) of <br />the Construction Materials Rules and Regulations, for failure to remove and segregate <br />topsoil from other spoil and/or a passible violation of the 34-32.5116 of the <br />Colorado Revised Statutes. commonly referred to as the Colorado Land Reclamation Act <br />for the Extraction of Construction Materials for failure to perform the reclamation plan <br />prescribed reclamation plan. <br />PB or PV: 3B_ <br />TOPIC(S): S~ <br />