Laserfiche WebLink
Corrective Action: Within 60 days of receipt of this report, submit proof to the Division that - - - <br />there is adeauate topsoil at the site to reclaim the site according to the approved <br />reclamation plan, or revise the reclamation plan to include importation of adeauate topsoil <br />to the site for reclamation. In the case where topsoil would be imported to the site the <br />Division will rPgalrn ilatP the bond for the site to inoli icier the rnst of to sp, mil ip1nortation and <br />the operator will be required to submit the additional bond. <br />