Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN(co►,T) <br /> placement of the soil stockpiles around the perimeter of the <br /> mined area or direct placement on the final slopes as stripping <br /> takes place helps reduce the cost to reclaim the site if mining <br /> ended midway thru the site. It also means that the topsoil, only <br /> has to be handled once and reclamation will run concurrent with <br /> mining. <br /> There are sufficient amounts of topsoil on the site so the <br /> mined area can be resoiled to an average depth between 10 and 12 <br /> inches . All topsoil encountered will be saved from the stripping <br /> process and the operator will not haul additional soils onto the <br /> site for revegetation. <br /> Once an area is backfilled, capped and resoiled it will be <br /> returned to crop production. The final slopes will be seeded <br /> with grass . The non cultivated area vegetation information was <br /> obtained from site visits and data provided in the vegetation <br /> information obtained from the NRCS soil survey web page. A copy <br /> if that report is in EXHIBIT' S I and J and describes the current <br /> cover in the terms of yearly production and will serve as back- <br /> ground information as reclamation progresses on the slopes and <br /> surface area surrounding the mined area. <br /> As outlined in the MINING PLAN, up to 38 . 7 acres ± of the <br /> permitted area will be disturbed as a result of mining. Since <br /> there are no stages in the permit, reclamation will run concur- <br /> rent with mining. The plan calls for having no more than 15. 0 <br /> acres ± disturbed at any-one-time. As mining progresses across <br /> the property some parts of the property will remain undisturbed <br /> while other areas will be either stripped, mined, partially <br /> reclaimed or totally reclaimed. The RECLAMATION PLAN MAP - <br /> EXHIBIT F shows how the area will look when reclamation is com- <br /> plete when the area has been backfilled. The non-crop areas will <br /> be returned to at least it 's present vegetative condition when <br /> reclamation is complete. <br /> Careful analysis of the growth medium and salvaged soil will <br /> permit the operator to carry out a soil additive program and to <br /> monitor the prescribed seeding plan and to determine if the plan <br /> requires revision. Under normal weather conditions, an adequate <br /> moisture reserve will be present for establishment of the pro- <br /> posed seed mixture. Irrigation is planned for the crop area but <br /> the side slopes and existing surface area will not be irrigated <br /> because we will be attempting to create a diverse dryland site <br /> that is non-water dependent . No revegetation will take place on <br /> access corridor, roads or the farm yard as they will remain <br /> graveled and for use as farming resumes . <br /> 8 1/2 Enterprises LLC. - December 9, 2025 <br /> Sasaki Pit <br /> 18 <br />