Laserfiche WebLink
Table 8 <br />Cripple Creek & Victor Gold Mining Company <br />Valley Leach Facility 2 Phase 3 <br />Stage B.1 Record of Construction <br />Soil Liner Fill Depth Verification Summary <br />NORTHING EASTING <br />LOCATION <br />PASS/FAILREQUIRED <br />DEPTH (IN)DATE SAMPLE NUMBER <br />DEPTH <br />(IN) <br />ELEVATION <br />(FT) <br />7/3/2025 SLF-40-D 15 57,803 37,655 FG 12 P <br />7/3/2025 SLF-41-D 14 57,754 37,685 FG 12 P <br />7/3/2025 SLF-42-D 13 57,707 37,640 FG 12 P <br />7/3/2025 SLF-43-D 13 57,713 37,540 FG 12 P <br />7/3/2025 SLF-44-D 14 57,655 37,700 FG 12 P <br />7/3/2025 SLF-45-D 12 57,678 37,751 FG 12 P <br />7/3/2025 SLF-46-D 13 57,660 37,816 FG 12 P <br />7/3/2025 SLF-47-D 14 57,727 37,857 FG 12 P <br />7/3/2025 SLF-48-D 13 57,851 37,912 FG 12 P <br />7/3/2025 SLF-49-D 15 57,875 37,900 FG 12 P <br />7/3/2025 SLF-50-D 17 57,888 37,870 FG 12 P <br />7/3/2025 SLF-51-D 17 57,945 37,883 FG 12 P <br />7/9/2025 SLF-52-D 18 57,936 37,875 FG 12 P <br />7/9/2025 SLF-53-D 14 58,103 37,899 FG 12 P <br />7/9/2025 SLF-54-D 15 58,163 37,909 FG 12 P <br />7/9/2025 SLF-55-D 13 58,266 37,964 FG 12 P <br />7/9/2025 SLF-56-D 13 58,280 38,035 FG 12 P <br />7/9/2025 SLF-57-D 15 58,366 38,075 FG 12 P <br />7/9/2025 SLF-58-D 17 58,041 38,092 FG 12 P <br />7/9/2025 SLF-59-D 15 58,017 38,050 FG 12 P <br />7/9/2025 SLF-60-D 15 57,994 38,002 FG 12 P <br />7/9/2025 SLF-61-D 17 57,587 37,844 FG 12 P <br />7/9/2025 SLF-62-D 14 57,555 37,890 FG 12 P <br />7/9/2025 SLF-63-D 14 57,542 37,855 FG 12 P <br />7/15/2025 SLF-64-D 15 57,501 37,854 FG 12 P <br />7/15/2025 SLF-65-D 18 57,452 37,858 FG 12 P <br />7/15/2025 SLF-66-D 18 57,465 37,787 FG 12 P <br />7/15/2025 SLF-67-D 14 57,404 37,851 FG 12 P <br />7/15/2025 SLF-68-D 13 57,513 37,614 FG 12 P <br />7/16/2025 SLF-69-D 13 57,443 37,586 FG 12 P <br />7/16/2025 SLF-70-D 12 57,783 38,011 FG 12 P <br />7/16/2025 SLF-71-D 17 57,803 38,047 FG 12 P <br />7/16/2025 SLF-72-D 16 58,074 38,215 FG 12 P <br />7/16/2025 SLF-73-D 14 57,955 37,615 FG 12 P <br />7/16/2025 SLF-74-D 15 57,916 37,708 FG 12 P <br />7/16/2025 SLF-75-D 18 57,559 37,984 FG 12 P <br />7/16/2025 SLF-76-D 14 57,675 37,971 FG 12 P <br />7/23/2025 SLF-77-D 14 57,615 37,954 FG 12 P <br />7/23/2025 SLF-78-D 14 57,561 37,953 FG 12 P <br />Page 2 of 3