|
Table 8
<br />Cripple Creek & Victor Gold Mining Company
<br />Valley Leach Facility 2 Phase 3
<br />Stage B.1 Record of Construction
<br />Soil Liner Fill Depth Verification Summary
<br />NORTHING EASTING
<br />LOCATION
<br />PASS/FAILREQUIRED
<br />DEPTH (IN)DATE SAMPLE NUMBER
<br />DEPTH
<br />(IN)
<br />ELEVATION
<br />(FT)
<br />7/23/2025 SLF-79-D 13 57,503 37,877 FG 12 P
<br />7/23/2025 SLF-80-D 14 57,433 37,842 FG 12 P
<br />7/23/2025 SLF-81-D 15 57,370 37,824 FG 12 P
<br />7/23/2025 SLF-82-D 17
<br />57,266 37,751 FG 12 P
<br />7/24/2025 SLF-83-D 16
<br />57,210 37,830 FG 12 P
<br />7/24/2025 SLF-84-D 18
<br />57,297 37,855 FG 12 P
<br />7/24/2025 SLF-85-D 14 57,350 37,915 FG 12 P
<br />7/24/2025 SLF-86-D 15 57,367 37,986 FG 12 P
<br />7/24/2025 SLF-87-D 15 57,444 38,044 FG 12 P
<br />7/24/2025 SLF-88-D 14
<br />57,549 38,124 FG 12 P
<br />7/24/2025 SLF-89-D 13
<br />57,493 38,179 FG 12 P
<br />7/24/2025 SLF-90-D 13
<br />57,460 38,233 FG 12 P
<br />7/24/2025 SLF-91-D 15 57,351 38,288 FG 12 P
<br />7/24/2025 SLF-92-D 14 57,327 38,184 FG 12 P
<br />7/24/2025 SLF-93-D 13 57,243 38,266 FG 12 P
<br />7/24/2025 SLF-94-D 13
<br />57,195 38,151 FG 12 P
<br />7/24/2025 SLF-95-D 14
<br />57,100 38,248 FG 12 P
<br />7/25/2025 SLF-96-D 14
<br />56,996 38,288 FG 12 P
<br />7/25/2025 SLF-97-D 14 56,934 38,276 FG 12 P
<br />7/25/2025 SLF-98-D 15 56,992 38,201 FG 12 P
<br />7/25/2025 SLF-99-D 18 57,019 38,152 FG 12 P
<br />7/25/2025 SLF-100-D 18
<br />56,852 38,272 FG 12 P
<br />7/25/2025 SLF-101-D 18
<br />56,778 38,258 FG 12 P
<br />7/25/2025 SLF-102-D 15
<br />56,763 38,199 FG 12 P
<br />Page 3 of 3
|