|
Table 8
<br />Cripple Creek & Victor Gold Mining Company
<br />Valley Leach Facility 2 Phase 3
<br />Stage B.1 Record of Construction
<br />Soil Liner Fill Depth Verification Summary
<br />NORTHING EASTING
<br />6/12/2025 SLF-1-D 17 59,147 37,348 FG 12 P
<br />6/12/2025 SLF-2-D 16 59,053 37,398 FG 12 P
<br />6/12/2025 SLF-3-D 18 58,967 37,491 FG 12 P
<br />6/12/2025 SLF-4-D 14 58,938 37,450 FG 12 P
<br />6/12/2025 SLF-5-D 14 58,938 37,578 FG 12 P
<br />6/12/2025 SLF-6-D 13 58,948 37,651 FG 12 P
<br />6/12/2025 SLF-7-D 14 58,865 37,665 FG 12 P
<br />6/20/2025 SLF-8-D 17 58,749 37,647 FG 12 P
<br />6/20/2025 SLF-9-D 13 58,723 37,555 FG 12 P
<br />6/20/2025 SLF-10-D 16 58,727 37,471 FG 12 P
<br />6/20/2025 SLF-11-D 17 58,757 37,421 FG 12 P
<br />6/20/2025 SLF-12-D 15 58,767 37,305 FG 12 P
<br />6/20/2025 SLF-13-D 13 58,372 37,402 FG 12 P
<br />6/20/2025 SLF-14-D 17 58,369 37,346 FG 12 P
<br />6/20/2025 SLF-15-D 13 58,267 37,529 FG 12 P
<br />6/20/2025 SLF-16-D 18 58,302 37,623 FG 12 P
<br />6/20/2025 SLF-17-D 17 58,328 37,592 FG 12 P
<br />6/30/2025 SLF-18-D 16 58,284 37,654 FG 12 P
<br />6/30/2025 SLF-19-D 15 58,235 37,817 FG 12 P
<br />6/30/2025 SLF-20-D 13 58,176 37,781 FG 12 P
<br />6/30/2025 SLF-21-D 16 58,110 37,730 FG 12 P
<br />6/30/2025 SLF-22-D 17 58,060 37,699 FG 12 P
<br />6/30/2025 SLF-23-D 17 58,022 37,660 FG 12 P
<br />6/30/2025 SLF-24-D 17 58,011 37,648 FG 12 P
<br />6/30/2025 SLF-25-D 13 58,005 37,635 FG 12 P
<br />6/30/2025 SLF-26-D 13 58,000 37,591 FG 12 P
<br />7/1/2025 SLF-27-D 14 57,995 37,611 FG 12 P
<br />7/1/2025 SLF-28-D 12 57,977 37,447 FG 12 P
<br />7/1/2025 SLF-29-D 13 57,899 37,388 FG 12 P
<br />7/1/2025 SLF-30-D 14 57,906 37,662 FG 12 P
<br />7/1/2025 SLF-31-D 13 57,834 37,624 FG 12 P
<br />7/1/2025 SLF-32-D 13 57,830 37,591 FG 12 P
<br />7/1/2025 SLF-33-D 16 57,891 37,859 FG 12 P
<br />7/1/2025 SLF-34-D 14 57,771 37,815 FG 12 P
<br />7/1/2025 SLF-35-D 15 57,616 37,872 FG 12 P
<br />7/1/2025 SLF-36-D 15 57,464 37,919 FG 12 P
<br />7/1/2025 SLF-37-D 18 57,302 38,069 FG 12 P
<br />7/3/2025 SLF-38-D 14 57,850 37,754 FG 12 P
<br />7/3/2025 SLF-39-D 16 57,825 37,678 FG 12 P
<br />LOCATION
<br />PASS/FAILREQUIRED
<br />DEPTH (IN)DATE SAMPLE NUMBER
<br />DEPTH
<br />(IN)
<br />ELEVATION
<br />(FT)
<br />Page 1 of 3
|