Laserfiche WebLink
Table 7Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2 Phase 3Stage B.1 Record of ConstructionNuclear Gauge Moisture-Density Testing Summary - Soil Liner FillNORTHING EASTING SAMPLE NUMBERMAX. DRY DENSITY (pcf)OPTIMUM MOISTURE (%)DRY DENSITY (pcf)MOISTURE CONTENT (%)SPECIFIED COMPACTION (%)COMPACTION (%)PASS/FAILFIELDLOCATIONTEST NUMBER DATE TESTEDDEPTH (in)LABORATORYSLF-96-N 7/25/2025 56,996 38,288 10 SLF-62-R 128.8 10.4 128.7 9.7 95 99.9 PASSSLF-97-N 7/25/2025 56,934 38,276 10 SLF-62-R 128.8 10.4 127.9 8.9 95 99.3 PASSSLF-98-N 7/25/2025 56,992 38,201 10 SLF-62-R 128.8 10.4 124.8 10.0 95 96.9 PASSSLF-99-N 7/25/2025 57,019 38,152 10 SLF-62-R 128.8 10.4 127.8 9.3 95 99.2 PASSSLF-100-N 7/25/2025 56,852 38,272 10 SLF-62-R 128.8 10.4 128.4 10.7 95 99.7 PASSSLF-101-N 7/25/2025 56,778 38,258 10 SLF-62-R 128.8 10.4 125.9 8.9 95 97.7 PASSSLF-102-N 7/25/2025 56,763 38,199 10 SLF-62-R 128.8 10.4 128.4 9.2 95 99.7 PASS 1 - RT indicates a Re-Test Page 4 of 4