Laserfiche WebLink
Table 6Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2Phase 3 Stage B.1 Record of ConstructionCQA Earthworks Testing Summary - Drain Cover Fill (Crushed Ore) with Lime Addition3.0" 2.0" 1.5" 1.0" 0.75" 0.5" 0.375" #4 #10 #16 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXPHASE100 97-100 - - 40-100 - - 5-35-----0-8--NPDCFO-1-C 06/06/25 B.1 FG - 100 100 97.6 75.1 61.2 45.5 37.9 22.5 13.5 10.6 6.6 5.5 3.6 2.4 GW NP NV NPDCFO-2-C 06/09/25 B.1 FG - 100 99.1 94.9 71.4 56.3 40.5 33.9 22.6 14.7 11.4 7 6 4.4 3.3 GP NP NV NPDCFO-3-C 07/02/25 B.1 FG - 100 100 94 74.3 60.5 46.2 35.8 24 15.1 12.7 7.9 7.1 5.3 4.8 GP NP NV NPDCFO-4-C 07/16/25 B.1 FG - 100 99.6 98.2 77.9 62.3 42 32.5 20.6 13 10.5 7.2 6.3 4.8 3.6 GP NP NV NPDCFO-5-R 07/16/25 B.1 FG - 100 100 94.5 73.6 59.4 43.8 37.2 22.1 14.1 11.4 8 6.9 5.3 4.6 GP NP NV NPDCFO-6-R 07/25/25 B.1 FG - 100 100 93.5 75.4 57.5 44.9 34.3 25.6 16.2 13.1 10.9 8.5 7 5.9 GP-GM NP NV NPDCFO-7-R 07/31/25 B.1 FG - 100 98.9 95.7 73.4 60.9 43.5 35 23.9 15.2 11.3 8.4 6.8 5.1 4.5 GP NP NV NPDCFO-8-R 08/06/25 B.1 FG - 100 100 97.9 72.6 58.3 46.4 33.7 24.6 15.7 12.2 9.4 7.8 6.5 6 GP-GM NP NV NPDCFO-9-R 08/13/25 B.1 FG - 100 100 90.6 68.4 55.9 41.6 28.6 19.4 12.9 9.5 6.8 5.8 4.1 2.8 GP NP NV NPDFCO-10-R 08/18/25 B.1 FG - 100 100 97.9 77.8 64.8 49.5 40.1 29.8 20.2 16.9 12.7 9.9 8.6 7.1 GP-GM NP NV NPDCFO-11-R 08/26/25 B.1 FG - 100 98.2 95.3 73.8 61.7 46.8 33.5 24.5 19.1 14.8 9.1 7.9 6.9 6.4 GP-GM NP NV NPP-5144SAMPLE NUMBERDATE SAMPLEDLOCATIONELEVATION (FT)P-5167P-5077P-51701. Samples with a Plasticity Index less than 5 are reported as Non PlasticStockpile/Liner Panel NumberJoe Dandy StockpileNorth StockpileP-4998P-5078USCS ATTERBERG LIMITSSPECIFICATION - PERCENT PASSING SPECIFICATIONNotes:South StockpileNATURAL MOISTURE (%)GRAIN SIZE DISTRIBUTION - PERCENT PASSINGJoe Dandy StockpileP-5021R - Record Sample; FG - Finished GradeNP - Non Plastic; NV - No ValuePage 1 of 1