|
Table 7Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2 Phase 3Stage B.1 Record of ConstructionNuclear Gauge Moisture-Density Testing Summary - Soil Liner FillNORTHING EASTING SAMPLE NUMBERMAX. DRY DENSITY (pcf)OPTIMUM MOISTURE (%)DRY DENSITY (pcf)MOISTURE CONTENT (%)SPECIFIED COMPACTION (%)COMPACTION (%)SLF-1-N 6/12/202559,147 37,34810 SLF-59-C 125.8 11.2 122.6 10.0 95 97.5 PASSSLF-2-N 6/12/202559,053 37,39810 SLF-59-C 125.8 11.2 123.0 10.4 95 97.8 PASSSLF-3-N 6/12/202558,967 37,49110 SLF-59-C 125.8 11.2 122.9 10.4 95 97.7 PASSSLF-4-N 6/12/202558,938 37,45010 SLF-59-C 125.8 11.2 124.3 10.2 95 98.8 PASSSLF-5-N 6/12/202558,938 37,57810 SLF-59-C 125.8 11.2 123.5 10.5 95 98.2 PASSSLF-6-N 6/12/202558,948 37,65110 SLF-59-C 125.8 11.2 124.7 10.8 95 99.1 PASSSLF-7-N 6/12/202558,865 37,66510 SLF-59-C 125.8 11.2 120.9 10.7 95 96.1 PASSSLF-8-N 6/20/202558,749 37,64710 SLF-59-C 125.8 11.2 124.4 10.7 95 98.9 PASSSLF-9-N 6/20/202558,723 37,55510 SLF-62-R 128.8 10.4 126.6 10.1 95 98.3 PASSSLF-10-N 6/20/202558,727 37,47110 SLF-62-R 128.8 10.4 127.0 9.9 95 98.6 PASSSLF-11-N 6/20/202558,757 37,42110 SLF-62-R 128.8 10.4 126.5 10.0 95 98.2 PASSSLF-12-N 6/20/202558,767 37,30510 SLF-62-R 128.8 10.4 125.0 10.5 95 97.0 PASSSLF-13-N 6/20/202558,372 37,40210 SLF-62-R 128.8 10.4 127.5 10.7 95 99.0 PASSSLF-14-N 6/20/202558,267 37,52910 SLF-62-R 128.8 10.4 124.0 10.0 95 96.3 PASSSLF-15-N 6/20/202558,369 37,34610 SLF-62-R 128.8 10.4 120.9 10.4 95 93.9 FAILSLF-15-RT16/20/202558,369 37,34610 SLF-62-R 128.8 10.4 124.0 10.0 95 96.3 PASSSLF-16-N 6/20/202558,302 37,62310 SLF-62-R 128.8 10.4 127.8 10.9 95 99.2 PASSSLF-17-N 6/20/202558,328 37,59210 SLF-62-R 128.8 10.4 127.9 10.9 95 99.3 PASSSLF-18-N 6/30/202558,284 37,65410 SLF-62-R 128.8 10.4 127.0 9.7 95 98.6 PASSSLF-19-N 6/30/202558,235 37,81710 SLF-62-R 128.8 10.4 127.1 9.3 95 98.7 PASSSLF-20-N 6/30/202558,176 37,78110 SLF-62-R 128.8 10.4 125.8 9.3 95 97.7 PASSSLF-21-N 6/30/202558,110 37,73010 SLF-62-R 128.8 10.4 127.2 10.4 95 98.8 PASSSLF-22-N 6/30/202558,060 37,69910 SLF-62-R 128.8 10.4 128.0 10.0 95 99.4 PASSSLF-23-N 6/30/202558,022 37,66010 SLF-62-R 128.8 10.4 128.2 10.6 95 99.5 PASSSLF-24-N 6/30/202558,011 37,64810 SLF-62-R 128.8 10.4 127.9 10.7 95 99.3 PASSSLF-25-N 6/30/202558,005 37,63510 SLF-62-R 128.8 10.4 127.4 10.4 95 98.9 PASSSLF-26-N 6/30/202558,000 37,59110 SLF-62-R 128.8 10.4 128.0 10.5 95 99.4 PASSSLF-27-N 7/1/202557,995 37,61110 SLF-62-R 128.8 10.4 125.5 10.0 95 97.4 PASSSLF-28-N 7/1/202557,977 37,44710 SLF-62-R 128.8 10.4 128.3 9.2 95 99.6 PASSSLF-29-N 7/1/202557,899 37,38810 SLF-62-R 128.8 10.4 127.0 9.0 95 98.6 PASSSLF-30-N 7/1/202557,906 37,66210 SLF-62-R 128.8 10.4 128.0 9.8 95 99.4 PASSSLF-31-N 7/1/202557,834 37,62410 SLF-62-R 128.8 10.4 127.1 10.0 95 98.7 PASSPASS/FAILFIELDLOCATIONTEST NUMBER DATE TESTEDDEPTH (in)LABORATORY 1 - RT indicates a Re-Test Page 1 of 4
|