Laserfiche WebLink
Table 5Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2Phase 3 Stage B.1 Record of ConstructionCQA Earthworks Testing Summary - Soil Liner Fill2.0" 1.5" 1.0" 0.75" 0.5" 0.375" #4 #10 #16 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXSPECIFICATIONPHASE NORTHING EASTING100-----------15-65- - 10 MIN.1x10-6SLF-50-C 10/02/23 Stockpile 100 98.0 92.6 86.3 79.4 73.5 64.4 55.0 48.6 37.8 33.7 28.2 24.1 SC 13 35 22 128.1 10.6 6.70E-07SLF-51-C 10/09/23 Stockpile 100 96.5 91.0 84.9 77.1 70.8 60.9 51.0 44.9 32.9 28.7 24.0 20.5 SC 12 34 22 126.7 11.2 9.10E-07SLF-52-C 10/16/23 Stockpile 100 97.9 92.7 85.3 73.9 67.4 58.3 49.2 43.8 34.6 31.0 26.3 23.1 GC 14 35 21 122.6 11.2 7.70E-07SLF-53-C 10/23/23 Stockpile 100 98.5 93.9 88.9 77.2 69.8 64.8 51.9 44.7 32.9 27.3 23.4 20.0 GC 14 38 24 126.1 10.9 3.30E-07SLF-54-C 10/31/23 Stockpile 100 95.1 89.6 84.1 75.6 69.0 60.1 49.9 43.2 31.9 27.8 23.9 21.5 GC 13 35 22 125.8 10.7 6.00E-07SLF-55-C 10/31/23 Stockpile 100 99.1 90.5 86.7 80.0 74.6 64.8 53.0 45.0 35.1 31.9 27.1 24.3 SC 15 34 19 121.4 11.4 6.90E-07SLF-56-C 11/05/23 Stockpile 100 94.7 88.5 83.5 78.1 73.9 65.7 56.3 49.4 39.5 35.8 30.2 26.1 SC 14 32 18 125.4 10.5 9.00E-07SLF-57-C 11/05/23 Stockpile 100 98.4 95.8 90.5 81.6 75.5 63.4 52.1 45.2 35.5 32.3 28.4 24.8 SC 13 30 17 125.2 10.1 6.80E-07SLF-58-C 11/12/23 Stockpile 100 97.9 91.6 83.6 74.9 70.0 60.7 48.9 41.8 30.3 26.2 21.9 18.9 SC 14 34 20 127.5 10.6 4.40E-07SLF-59-C 05/09/25 Stockpile 100 97.8 91.4 84.3 74.6 74.1 59.1 46.9 40.6 31.2 28.6 24.7 21.3 GC 15 37 22 125.8 11.2 5.20E-07SLF-60-C 05/14/25 Stockpile 100 99.2 96.7 92.8 85.3 80.6 70.8 56.5 48.8 37.6 34.5 29.8 25.6 SC 15 29 14 127.4 10.4 7.50E-07SLF-61-C 05/21/25 Stockpile 100 98.9 93.8 86.8 76.6 70.4 56.5 41.8 35.8 27.5 25.3 21.6 18.5 GC 14 34 20 124.5 11.6 9.20E-07SLF-62-R 05/29/25 B.1 58,337.0 37,514.0 10,205.0 100 98.7 95.5 91.5 82.2 77.0 63.9 49.3 42.5 32.7 30.1 25.8 22.0 SC 14 31 17 126.5 11.5 4.00E-07SLF-63-R 06/02/25 B.1 57,573.0 37,771.0 10,275.0 100 99.6 96.6 92.8 82.1 75.9 65.6 52.3 45.2 34.7 31.9 27.4 23.2 SC 16 31 15 128.8 10.4 2.60E-07Notes:Upper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileUpper Dump 1 SLF StockpileSamples SLF-1-C thru SLF- 49-C were included in the VLF2 Phase 3 Stage A.1 and A.2 Record of Construction reports. SAMPLE NUMBERDATE SAMPLEDLOCATIONPERMEABILITY (k=cm/s)MAXIMUM DRY DENSITY (PCF)OPTIMUM MOISTURE CONTENT (%)SPECIFICATIONELEVATION (FT)USCSATTERBERG LIMITSGRAIN SIZE DISTRIBUTION - PERCENT PASSINGSPECIFICATION - PERCENT PASSINGMOISTURE/DENSITYUpper Dump 1 SLF StockpileR - Record Sample; C - Control Sample; FG - Finished GradeNP - Non Plastic; NV - No Value; NT - Not TestedPage 1 of 1