Laserfiche WebLink
JD-8 Mine Environmental Protection Plan <br /> • Table 11: Monthly Climate Summary at Uravan, Colorado 31 <br /> November 17, 1960—December 31, 2010 31 <br /> Table 12: Monthly Climate Summary at the Proposed Pinon Ridge Mill Site 31 <br /> May 2008—April 2009 31 <br /> Table 13: Monthly Precipitation at Uravan, Colorado 33 <br /> Table 14: Recurrence Interval for Design Storms 34 <br /> Table 15:Average Monthly Wind Speed(mph)at Nucla Meteorological Station 35 <br /> Table 16:Average and Maximum Wind Speed(mph)at Nucla Meteorological Station 35 <br /> Table 17: Monthly Average and Annual Pan Evaporation 36 <br /> Table 18: Springs, Reservoirs and Ditches Located within Two Miles of the JD-8 Mine Portal 37 <br /> Table 19: Lithologic Units in Colorado Plateau Physiographic Province and Paradox Basin Sub-Province <br /> 39 <br /> Table 20: Hydrostratigraphic Units of the Paradox Basin(Topper, et al.,2003) 45 <br /> Table 21: Project Water Requirements 47 <br /> Table 22: Inventory of Wells Located within Two Miles of the JD-8 Mine Waste Pile 48 <br /> Table 23: Lysimeter Monitoring Results 50 <br /> • Table 24: Construction Schedule 53 <br /> Table 25: Soil Types in Vicinity of the JD-8 Mine 54 <br /> Table 26: Reseeding Mix for DOE Uranium Leasing Sites 56 <br /> LIST OF ATTACHMENTS <br /> Attachment 1. Maps <br /> Attachment 2. Materials Safety Data Sheets <br /> Attachment 3. Laboratory Analytical Results <br /> Attachment 4. Stormwater Management Plan <br /> • <br /> 5 <br />