My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-11-14_PERMIT FILE - M2025056 (26)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025056
>
2025-11-14_PERMIT FILE - M2025056 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 9:51:53 AM
Creation date
11/20/2025 8:26:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025056
IBM Index Class Name
Permit File
Doc Date
11/14/2025
Doc Name Note
Exhibit T JD-8 Environmental Protection Plan
Doc Name
Application
From
Highbury Resources Inc
To
DRMS
Email Name
DMC
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JD-8 Mine Environmental Protection Plan <br /> . 12.1 Wildlife Species 57 <br /> 12.2 Mitigation Measures for Wildlife Protection 57 <br /> 13. CONCLUSIONS 58 <br /> 14. REFERENCES 58 <br /> LIST OF FIGURES <br /> Figure 1: General Location of the JD-8 Mine 8 <br /> Figure 2: EPP Facilities Location Map 15 <br /> Figure 3: Ore Pile Sample Locations 16 <br /> Figure 4: Waste Rock Pile Sample Locations 16 <br /> Figure 5: Comparison of Monthly Precipitation Measurements at the Proposed Pinon Ridge Mill Site and <br /> Uravan, CO for May 2008—April 2009 32 <br /> Figure 6: Upper Dolores River Basin (EPA, 2010) 36 <br /> Figure 7: Geologic Map of the Bull Canyon Quad(Cater, 1954) 40 <br /> Figure 8: Geologic Cross Section of the Paradox Valley (Cater, 1954) 40 <br /> Figure 9: Stratigraphic Cross Section ofJD-8 Mine Site(White,2006) 42 <br /> • Figure 10: Regional Groundwater Flow System in the Paradox Basin(Topper, et al. 2003) 46 <br /> Figure 11: Lysimeter Location 49 <br /> LIST OF TABLES <br /> Table 1: Permits and Environmental Monitoring Requirements 11 <br /> Table 2: Composited Samples for Geochemical Testing 17 <br /> Table 3: Mass of Composited Samples Submitted for SPLP, Whole Rock,and ABA Analysis 18 <br /> Table 4:ABA Results for Representative Composite Samples from the JD-8 Waste Rock Pile and Ore Pile <br /> 19 <br /> Table 5: SPLP and Whole Rock Results for Representative Composite Samples from the JD-8 Waste <br /> Rock Pile and Ore Pile 21 <br /> Table 6: 2005 SPLP Test Results for Waste Rock and Ore for the JD-8 Mine 22 <br /> Table 7: 2007 ABA and Whole Rock Testing for the JD-8 Mine Waste Rock and Ore Pile 23 <br /> Table 8: Constituents of Potential Concern in JD-8 Waste Rock Pile and Ore Pile 23 <br /> Table 9: Potential for Radioactive Bioaccumulation and Sequestration of Site Soils 26 <br /> Table 9: Potential for Radioactive Bioaccumulation and Sequestration of Site Soils (Part 2) 27 <br /> • Table 10: Meteorological Stations, Type, Period of Record, and Distance from the JD-8 Site 30 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.