Laserfiche WebLink
JD-8 Mine Environmental Protection Plan <br /> • 6. MATERIALS HANDLING 29 <br /> 6.1 Materials Handling for Designated Chemicals Originating Offsite 29 <br /> 6.2 Materials Handling for Designated Chemicals Originating Onsite 29 <br /> 7. CLIMATE 29 <br /> 7.1 Meteorological Stations 29 <br /> 7.2 Precipitation 30 <br /> 7.3 Storm Frequency 34 <br /> 7.4 Temperature 34 <br /> 7.5 Wind Speed 34 <br /> 7.6 Evaporation 35 <br /> 8. SURFACE WATER DATA 36 <br /> 8.1 Inventory of Water Courses, Springs, Reservoirs, and Ditches 37 <br /> 9. GROUNDWATER DATA 38 <br /> 9.1 Geologic Setting 38 <br /> 9.1.1 Regional Geology 38 <br /> 9.1.2 Site Geology 41 <br /> • 9.1.3 Economic Geology 42 <br /> 9.2 Regional Groundwater System 43 <br /> 9.2.1 Hydrostratigraphic Units 43 <br /> 9.2.2 Aquifer Recharge 44 <br /> 9.2.3 Flow Direction and Aquifer Discharge 44 <br /> 9.3 Inventory of Wells and Water Use 47 <br /> 9.4 Lysimeter Monitoring 49 <br /> 9.5 Local Hydrogeologic System 50 <br /> 9.5.1 Stratigraphic Units 50 <br /> 9.5.2 Recharge 51 <br /> 9.5.3 Local Groundwater Occurrence and Flow Direction 51 <br /> 9.5.4 Groundwater Quality 51 <br /> 10. CONSTRUCTION SCHEDULE 52 <br /> 11. SOILS STOCKPILE AND REVEGETATION 53 <br /> 11.1 Soils 54 <br /> 11.2 Reseeding Specifications 55 <br /> • 12. WILDLIFE PROTECTIONS 56 <br /> 3 <br />