My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-01_BONDING - M1980224
DRMS
>
Day Forward
>
Bonding
>
Minerals
>
M1980224
>
2025-10-01_BONDING - M1980224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 3:22:23 PM
Creation date
10/1/2025 3:02:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980224
IBM Index Class Name
Bonding
Doc Date
10/1/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
CC&V
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # A1000 Page 2 of 2 <br /> <br /> <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.800 (SSD-AC) <br />Push gradient: 1.225 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.821 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.7212 <br /> <br />Adjusted unit production: 926.45 LCY/hr <br />Adjusted fleet production: 1852.9 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.541/LCY <br /> <br />Total job time: 3,264.28 Hours <br />Total job cost: $3,273,128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.