My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-01_BONDING - M1980224
DRMS
>
Day Forward
>
Bonding
>
Minerals
>
M1980224
>
2025-10-01_BONDING - M1980224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 3:22:23 PM
Creation date
10/1/2025 3:02:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980224
IBM Index Class Name
Bonding
Doc Date
10/1/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
CC&V
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: AGVLF - Topsoil - Transport <br />Site: Cresson Project Permit Action: AM14 Permit/Job#: M1980244 <br /> <br />PROJECT IDENTIFICATION <br />Task #: A1004 State: Colorado Abbreviation: None <br />Date: 10/1/2025 County: Teller Filename: AM14 - A1004 <br />User: ERR <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Cat 777F <br />-Loader: CAT 992K <br />Support Equipment -Load Area: Cat D10T - 10SU <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 7,000 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 100 100 NA 25 25 <br />Ownership cost/hour: $219.20 $268.43 $266.69 NA $78.02 $75.70 <br />Operating cost/hour: $146.10 $234.59 $196.65 NA $17.13 $19.69 <br />%Utilization-riper: NA 0 NA NA NA NA <br />Ripper own. cost/hour: NA $0.00 $0.00 NA $0.00 $0.00 <br />Ripper op. cost/hour: NA $0.00 $0.00 NA $0.00 $0.00 <br />Operator cost/hour: $26.80 $59.52 $38.02 NA $60.00 $20.81 <br />Unit Subtotals: $392.10 $562.54 $501.36 NA $155.15 $116.19 <br />Number of Units: 2 1 1 0 1 1 <br />Group Subtotals: Work: $1,346.74 Support: $501.36 Maint: $271.34 <br />Total work team cost/hour: $2,119.44 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 25,997 CCY Swell factor: 1.215 <br />Loose volume: 31,586 LCY <br />Source of estimated volume: AM14 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br /> <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br /> Material weight: 1,600 Pounds/LCY <br /> Description: Top Soil <br /> Rated Payload: 200,000 Pounds <br />Payload Capacity: 125.00 LCY
The URL can be used to link to this page
Your browser does not support the video tag.