Laserfiche WebLink
Bulldozer Worksheet Cont’d Task # A1000 Page 1 of 2 <br /> <br /> <br />BULLDOZER WORK <br /> <br />Task description: AGVLF - Pile Leveling - Mass Grading <br />Site: Cresson Project Permit Action: AM14 Permit/Job#: M1980244 <br /> <br />PROJECT IDENTIFICATION <br />Task #: A1000 State: Colorado Abbreviation: None <br />Date: 10/1/2025 County: Teller Filename: AM14-A1000 <br />User: ERR <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - 10SU <br />Horsepower: 574 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $266.69 NA <br />Operating Cost/Hour: $196.65 100 <br />Ripper own. Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.02 NA <br />Total unit Cost/Hour: $501.36 <br />Total Fleet Cost/Hour: $1,002.71 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 6,048,388 <br />Swell factor: 1.000 <br />Loose volume: 6,048,388 LCY <br />Source of estimated volume: AM14 <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 145 feet <br />Unadjusted hourly production: 1,284.6 LCY/hr <br /> <br />Materials consistency description: Loose stockpile 1.2 <br /> <br />Average push gradient: -10 % <br />Average site altitude: 9,500 feet <br /> <br />Material weight: 2,800 lbs/LCY <br /> <br />Weight description: Granite - Broken <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.200 (S-BY-S) <br />Visibility: 1.000 (AVG.)