Laserfiche WebLink
Table D-1 Mining Timetable <br /> Description Acreage Tons Time Required <br /> Mining of Phase 1 43.5 2,000,000 • 20 Years <br /> Mining of Phase 2 (Visual Berm) 7.9 300,000 3 Years <br /> Mining of Phase 3 101.0 2,000,000 20 Years <br /> Mining of Phase 4(Visual Berm) 8.9 300,000 , 3 Years <br /> Total 146 Years <br /> 3. Mine Facilities, Equipment, and Access <br /> The site will contain the following facilities and equipment: <br /> Facilities: <br /> - Portable toilet <br /> - Portable fuel storage <br /> Equipment: <br /> - Front-end loaders <br /> - Bulldozers <br /> - Scrapers <br /> - Haul Trucks <br /> - Water trucks <br /> - Graders <br /> - Excavators <br /> - Portable Crushing and Screening Plant <br /> - Scale <br /> The operator will provide portable toilets and bottled water to employees on site during <br /> operations. Any fuel stored on site will have full secondary containment that can hold 110% of <br /> the fuel tank volume. All facilities and equipment will be removed during reclamation. <br /> No new permanent roads will be created over the mine's life. Temporary internal roads will be <br /> used to move material and equipment around the site with as minimal footprint utilized as <br /> possible. All temporary internal mine roads will be reclaimed by final reclamation. <br /> 4. Water Information, Rights, and Augmentation <br /> All water right issues such as availability of water for this operation, consumption rates, dust <br /> control, etc. are presented in Exhibit G—Water Information. <br /> Yampa Valley Gravel Pit <br /> August 2025 D-2 Lewicki& Associates <br />