My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-09_REVISION - C2009087 (37)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2025-07-09_REVISION - C2009087 (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 10:41:42 AM
Creation date
7/10/2025 9:44:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
7/9/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
RN3
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond Review PDYSGCK Page 2 of 167 <br /> Truck Bed(volume)Basis. <br /> Struck Volume: 21.60 LCY <br /> Heaped Volume: 31.70 LCY <br /> Average Volume: 26.65 LCY <br /> Adjusted Volume: 30.94 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 30.36 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 9.200 LCY(heaped) <br /> Bucket Fill Factor: 0.825 Blasted rock-avg.blasted (75 -90%)0.825 <br /> Adjusted Capacity: 7.590 LCY <br /> Job Condition Corrections: Site Altitude(ft.): 6800 feet <br /> Truck Loader Source <br /> Altitude Ad': 1.000 1.000 CAT HB <br /> Job Efficiency: 0.830 0.830 CAT HB <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill 4 passes <br /> Excavators and Front Shovels: <br /> Truck <br /> Machine Cycle Time vs.Job Condition Rating: NA <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump, 0.575 minutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Mixed material 0.02 0.020 (Cat HB) <br /> Stockpile: Conveyor or dozer piled 10 ft.high and up 0.000 (Cat HB) <br /> 0.00 <br /> Truck Ownership: Common ownership of trucks and loaders- -0.040 (Cat HB) <br /> 0.04 <br /> Operation: Constant operation-0.04 -0.040 (Cat HB) <br /> Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.060 minutes <br /> Adjusted Loader Cycle Time: 0.515 minutes <br /> Net Load Time per Truck: 1.645 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.60 Minutes Adjusted for site altitude: 0.600 Minutes <br /> Truck Load Time: 1.645 Minutes Adjusted for site altitude: 1.645 Minutes <br /> Truck Maneuver and Dump 1.00 Minutes Adjusted for site altitude: 1.000 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Firm,smooth,rolling_,dirt/It. surfaced,watered, <br /> maintained 3.0 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.