My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-09_REVISION - C2009087 (37)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2025-07-09_REVISION - C2009087 (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 10:41:42 AM
Creation date
7/10/2025 9:44:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
7/9/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
RN3
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond Review PDYSGCK Page 1 of 167 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Haul Backfdl Mat.from Coal Handling Fac.to Portal <br /> Site: Peabody Sage Creek Mine Permit Action: BondReview Permit/Job#: C2009087 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 12/18/2024 County: Routt Filename: BondReview <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 770D <br /> -Loader: CAT 988H <br /> Support Equipment-Load Area: Cat D10T- lOSU <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support E ui went Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 95 100 NA NA 25 <br /> Ownership cost/hour: $116.19 $131.26 $257.39 NA NA $111.67 <br /> Operating cost/hour: $85.60 $95.11 $196.93 NA NA $29.61 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 $0.00 NA NA $0.00 <br /> Ripper op.cost/hour: NA $0.00 $0.00 NA NA $0.00 <br /> Operator cost/hour: $25.24 $36.85 $38.59 NA NA $21.12 <br /> Unit Subtotals: $227.03 $263.23 $492.91 NA NA $162.40 <br /> Number of Units: 4 2 1 0 0 1 <br /> Group Subtotals: Work: $1,434.58 Support: $492.91 Maint: $162.40 <br /> Total work team cost/hour: $2,089.89 <br /> MATERIAL QUANTITIES <br /> Initial volume: 291,017 CCY Swell factor: 1.125 <br /> Loose volume: 327,394 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,650 Pounds/LCY <br /> Description: Decomposed rock-25%Rock,75%Earth <br /> Rated Payload: 82,000 Pounds <br /> Payload Capacity: 30.94 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.