Laserfiche WebLink
Bond Review PDYSGCK Page 3 of 167 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 950.00 -5.00 3.00 -2.00 3893 0.294 <br /> Haul Time: 0.294 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 950.00 5.00 3.00 8.00 2120 0.572 <br /> Return Time: 0.572 minutes <br /> Total Truck Cycle Time: 4.111 minutes <br /> Loading Tool unit <br /> Production 811.40 LCY/Hour Adjusted for job efficiency: 673.46 LCY/Hour <br /> Truck Unit Production <br /> 443.10 LCY/Hour Adjusted for job efficiency: 367.78 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 735.55 LCY/Hour <br /> Adjusted single truck/loader team production: 673.46 LCY/Hour <br /> Adjusted multiple truck/loader team production: 1,346.93 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 2 Team(s) Total job time: 243.07 Hours <br /> Unit cost: $1.552 /LCY Total job cost: $507,983 <br /> CIRCES Cost Estimating Software <br />