Laserfiche WebLink
Page 1 of 2 <br /> WHEEL LOADER—LOAD AND CARRY WORK <br /> Task description: Topsoil salvage from TR69 <br /> Site: Roadside Portals Permit Action: 2024 BCI Revised Permit/Job#: C1981041 <br /> PROJECT IDENTIFICATION <br /> Task#: 207 State: Colorado Abbreviation: None <br /> Date: 8/l/2024 County: Mesa Filename: C041-207 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 914G Horsepower: 95 <br /> Attachment 1: ROPS Cab Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $18.75 NA <br /> Operating Cost/Hour: $19.99 100 <br /> Operator Cost/Hour: $56.64 NA <br /> Total Unit Cost/Hour: $95.38 <br /> Total Fleet Cost/Hour: $95.38 <br /> MATERIAL QUANTITIES <br /> Initial volume: 325 CCY Swell factor: 1.250 <br /> Loose volume: 406 LCY <br /> Source of estimated volume: TR69 <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Loader Cycle Time: Unadjusted Basic Cycle Time(load,dump, 0.450 minutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Bank or broken material 0.04 0.040 (Cat HB) <br /> Stockpile: No adjustment-factor not applicable 0.00 0.000 (Cat HB) <br /> Truck Ownership: Common ownership of trucks and loaders- -0.040 (Cat HB) <br /> 0.04 <br /> Operation: Constant operation-0.04 -0.040 (Cat HB) <br /> Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.040 minutes <br /> Adjusted Basic Cycle Time: 0.410 minutes <br /> Rolling Resistance—Road Conditions <br /> Haul: Firm,smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Return: Firm,smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Haul and Return Time <br /> Length Grade Res. Rolling Total Res. Travel Time Source <br /> (feet) (%) Res.(%) (%) (minutes) <br /> CIRCES Cost Estimating Software <br />