My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-01_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2025-07-01_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 8:09:39 AM
Creation date
7/2/2025 8:07:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
7/1/2025
Doc Name
Midterm Review Document
From
DRMS
To
Tonya Hammond -Snowcap Coal Company, Inc.
Type & Sequence
MT9
Permit Index Doc Type
Findings
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task#207 Page 2 of 2 <br /> Haul Route: 150 3.00 3.00 6.00 0.1164 (Cat HB) <br /> Return Route: 150 -3.00 3.00 0.00 0.0527 (Cat HB) <br /> Total Travel Time: 0.1692 minutes <br /> Total Cycle Time: 0.5792 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 1.80 LCY(heaped) <br /> Bucket Fill Factor: 0.975 Loose material-mixed moist aggregates(95-100%)0.975 <br /> Adjusted Capacity: 1.76 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 5100 feet <br /> Source <br /> Altitude Adj: 0.95 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.79 multiplier <br /> Unadjusted Hourly Unit Production: 181.82 LCY/Hour <br /> Adjusted Hourly Unit Production: 143.36 LCY/Hour <br /> Adjusted Hourly Fleet Production: 143.36 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 2.83 Hours <br /> Unit cost: $0.665 /LCY Total job cost: $270 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.