Laserfiche WebLink
Mobilization Worksheet Cont'd Task#205 Page 3 of 3 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: GRAND JUNCTION <br /> Total one-way travel distance: 25.00 miles <br /> Average Travel Speed: 25.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $5,767.38 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $536.14 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 1.00 1.00 <br /> Return Time(Hours): 1.00 1.00 <br /> Loading Time(Hours): 0.00 NA <br /> Unloading Time(Hours): 0.00 NA <br /> Subtotals: 2.00 2.00 <br /> JOB TIME AND COST <br /> Total job time: 4.00 Hours <br /> Total job cost: $6,304 <br /> CIRCES Cost Estimating Software <br />