My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-05_REVISION - M2019005
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2019005
>
2025-05-05_REVISION - M2019005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 8:11:40 AM
Creation date
5/5/2025 10:37:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019005
IBM Index Class Name
Revision
Doc Date
5/5/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Jodi Schreiber PFM Consulting LLC
Type & Sequence
SI1
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> Task description: Rip the affected land <br /> Site: Goodrich Pit Permit Action: 2025 Inspection Permit/Job#: M2019005 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 4/14/2025 County: Las Animas Filename: 2 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU Horsepower: 310 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $173.32 NA <br /> Operating Cost/Hour: $109.71 100 <br /> Ripper Ownership Cost/Hour: $14.53 NA <br /> Ripper Operating Cost/Hour: $7.95 100 <br /> Operator Cost/Hour: $38.59 NA <br /> Total Unit Cost/Hour: $344.10 <br /> Total Fleet Cost/Hour: $688.19 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 77.39 acres Rip Depth(ft): 2.00 Volume: 249,712 BCY or CCY <br /> Source of estimated quantity: 80 acres less 2.61 acres <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 2.56 feet/pass <br /> Average Ripping Width: 7.08 feet/pass <br /> Average Ripping Length: 500.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.822 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.822 Acres/hr <br /> Site Altitude: 6,100 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.68 Acres/hr <br /> Adjusted Hourly Fleet Production: 1.36 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 2 Grader(s) Total job time: 56.72 Hours <br /> Unit cost: $504.345 Per acre Total job cost: $39,031 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.