Laserfiche WebLink
Pagel of 2 <br /> WHEEL LOADER—LOAD AND CARRY WORK <br /> Task description: Spread topsoil <br /> Site: Goodrich Pit Permit Action: 2025 Inspection Permit/Job#: M2019005 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 4/14/2025 County: Las Animas Filename: 3 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 966H Horsepower: 262 <br /> Attachment 1: ROPS Cab Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $57.78 NA <br /> Operating Cost/Hour: $46.25 100 <br /> Operator Cost/Hour: $36.85 NA <br /> Total Unit Cost/Hour: $140.88 <br /> Total Fleet Cost/Hour: $281.77 <br /> MATERIAL QUANTITIES <br /> Initial volume: 64,533 CCY Swell factor: 1.000 <br /> Loose volume: 64,533 LCY <br /> Source of estimated volume: 80 Acres,6"deep <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Loader Cycle Time: Unadjusted Basic Cycle Time(load,dump,maneuver): 0.500 minutes <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Mixed material 0.02 0.020 (Cat HB) <br /> Stockpile: Dumped by truck 0.02 0.020 (Cat HB) <br /> Truck Ownership: Common ownership of trucks and loaders-0.04 -0.040 (Cat HB) <br /> Operation: No adjustment-factor not applicable 0.00 0.000 (Cat HB) <br /> Dump Target: Nominal target 0.00 0.000 Cat HB <br /> Net Cycle Time Adjustment: 0.000 minutes <br /> Adjusted Basic Cycle Time: 0.500 minutes <br /> Rolliniz Resistance—Road Conditions <br /> Haul: Rutted dirt,little maintenance,no water, 1"tire penetration 4.0 <br /> Return: Rutted dirt,little maintenance,no water, 1"tire penetration 4.0 <br /> Haul and Return Time <br /> Length Grade Res. Rolling Total Res. Travel Time Source <br /> feet % Res. % % minutes <br /> Haul Route: 500 0.00 4.00 4.00 0.4222 (Cat HB) <br /> Return Route: 500 0.00 4.00 4.00 0.3923 Cat HB <br /> CIRCES Cost Estimating Software <br />