Laserfiche WebLink
Loader Worksheet Cont'd Task#003 Page 2 of 2 <br /> Total Travel Time: 0.8145 minutes <br /> Total Cycle Time: 1.3145 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 5.00 LCY(heaped) <br /> Bucket Fill Factor: 0.900 Other-soil,boulders,roots(80-100%)0.900 <br /> Adjusted Capacity: 4.50 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 6100 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 205.40 LCY/Hour <br /> Adjusted Hourly Unit Production: 170.48 LCY/Hour <br /> Adjusted Hourly Fleet Production: 340.96 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 2 Loader(s) Total job time: 189.27 Hours <br /> Unit cost: $0.826 /LCY Total job cost: $53,331 <br /> CIRCES Cost Estimating Software <br />