My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-05_REVISION - M2019005
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2019005
>
2025-05-05_REVISION - M2019005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 8:11:40 AM
Creation date
5/5/2025 10:37:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019005
IBM Index Class Name
Revision
Doc Date
5/5/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Jodi Schreiber PFM Consulting LLC
Type & Sequence
SI1
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#OO1B Page 2 of 2 <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.601 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.697 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4668 <br /> Adjusted unit production: 653.52 LCY/hr <br /> Adjusted fleet production: 653.52 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.516/LCY <br /> Total job time: 6.44 Hours <br /> Total job cost: $2,174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.