Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#00113 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Spread 6 inches of topsoil over graded west highwall <br /> Site: The Broyles Pit Permit Action: 2025 Inspection Permit/Job#: M2004028 <br /> PROJECT IDENTIFICATION <br /> Task#: 00113 State: Colorado Abbreviation: None <br /> Date: 4/17/2025 County: Las Animas Filename: M028-001b <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $173.32 NA <br /> Operating Cost/Hour: $109.71 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $321.62 <br /> Total Fleet Cost/Hour: $321.62 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 81 <br /> Swell factor: 1.215 <br /> Loose volume: 98 LCY <br /> Source of estimated volume: 6 inches of topsoil over 0.1 acre area <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 1,400.0 LCY/hr <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push gradient: 0% <br /> Average site altitude: 5,570 feet <br /> Material weight: 1,6001bs/LCY <br /> Weight description: Top Soil <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br />