Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#OOIA Page 2 of 2 <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3890 <br /> Adjusted unit production: 544.60 LCY/hr <br /> Adjusted fleet production: 544.6 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.591/LCY <br /> Total job time: 1.04 Hours <br /> Total job cost: $334 <br />