My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-05_REVISION - M2004028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004028
>
2025-05-05_REVISION - M2004028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 9:10:43 AM
Creation date
5/5/2025 10:28:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004028
IBM Index Class Name
Revision
Doc Date
5/5/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Michele M and Frederic V Eichler IV
Type & Sequence
SI1
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#OOIA Page 2 of 2 <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3890 <br /> Adjusted unit production: 544.60 LCY/hr <br /> Adjusted fleet production: 544.6 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.591/LCY <br /> Total job time: 1.04 Hours <br /> Total job cost: $334 <br />
The URL can be used to link to this page
Your browser does not support the video tag.