My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-05_REVISION - M2004028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004028
>
2025-05-05_REVISION - M2004028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 9:10:43 AM
Creation date
5/5/2025 10:28:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004028
IBM Index Class Name
Revision
Doc Date
5/5/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Michele M and Frederic V Eichler IV
Type & Sequence
SI1
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#001A Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Grading in West Pit(Push-up method) <br /> Site: The Broyles Pit Permit Action: 2025 Inspection Permit/Job#: M2004028 <br /> PROJECT IDENTIFICATION <br /> Task#: 001A State: Colorado Abbreviation: None <br /> Date: 4/16/2025 County: Las Animas Filename: M028-001a <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $173.32 NA <br /> Operating Cost/Hour: $109.71 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $321.62 <br /> Total Fleet Cost/Hour: $321.62 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 502 <br /> Swell factor: 1.125 <br /> Loose volume: 565 LCY <br /> Source of estimated volume: 113'x 8'highwall close to boundary to cut-fill to 4H:1V <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 1,400.0 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: 0% <br /> Average site altitude: 5,570 feet <br /> Material weight: 2,6501bs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.